My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
091625 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:30:34 PM
Creation date
10/10/2025 3:15:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/16/2025
DESTRUCT DATE
15Y
DOCUMENT NO
REGULAR MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 5 <br />complete design and construction of budgeted capital projects and Safeguarding our <br />City, Strategy 1 – Assess the City’s overall emergency preparedness capabilities, resources, <br />and tools and implement changes as needed to ensure the City is properly positioned to <br />respond to disasters. The fire alarm retrofit projects will promote the effective use of existing <br />facilities through repair with a focus on emergency preparedness and response. The CIP <br />projects also advance the strategic goal of Investing in Our Environment - Strategy No. 1 by <br />implementing budgeted project CIP No. 23457 and CIP No. 26386. <br /> <br />FISCAL IMPACT <br />The OSC Fire Alarm & Notification System, CIP No. 23457, is funded as part of FY 2022/23 <br />and received additional funding allocation in FY 2024/25. The Library Fire Alarm Upgrade, CIP <br />No. 26386, is funded as part of FY 2025/26. The total programmed amount for both projects is <br />$1.85 million. The total anticipated project expenditure with the recommended proposal is $1.3 <br />million, including design and construction contingency, soft costs, and on-call professional <br />services. This also includes the addition of the Police Station and LPFD Training Center fire <br />alarm upgrades. A project contingency of 20 percent will address unforeseen scope of work <br />identified during the detailed design and address existing conflicts encountered once the walls <br />and ceilings are opened up during construction. The funding and anticipated project <br />expenditures are detailed in Attachment 2. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Adam Nelkie, Assistant Dir. <br />of Public Works - <br />Engineering <br />Siew-Chin Yeong, Director of Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. Bid Summary <br />2. Financial Expenditure Summary <br /> <br />Page 120 of 264
The URL can be used to link to this page
Your browser does not support the video tag.