Laserfiche WebLink
City of Pleasanton <br />Emergency Operations Plan <br /> 18 June 2025 <br />including mobile shelters for various pets, and can potentially be located near a designated shelter. <br />Throughout Alameda County, there are numerous individuals and organizations (farms, ranches, and <br />others) with large animals such as horses, cattle, sheep, goats, and/or pigs. Owners should make <br />appropriate preparations (e.g., sheltering, transporting) in advance for their animals before an actual <br />disaster occurs. <br />4.0. E MERGENCY O PERATIONS C ENTER <br />Pleasanton operates an EOC that provides a centralized location where emergency management <br />coordination and decision-making occur and can support field operations during a critical incident, major <br />emergency, or disaster. When activated, the EOC provides support for a number of critical tasks related <br />to communication, coordination, resource management, and executive leadership. <br />4.1. EOC Locations <br />The primary EOC location is: Remillard Conference Room, 3333 Busch Rd., Pleasanton, CA <br />The alternate EOC location is: Pleasanton Police Station, 4833 Bernal Ave., Pleasanton, CA <br />Emergency Management Software/Application can be used for virtual activations <br />Alternate locations would be used when the primary EOC would or might be unsafe or unusable. <br />Situations and circumstances may arise in which staffing an in-person EOC fully or partially may be <br />impractical or unsafe. Alternative staffing options may be considered and implemented and may include <br />remote, virtual, or a combination of in-person and remote. Staff will be provided with appropriate tools, <br />equipment, and training in order to perform their assigned responsibilities. The City’s Director of <br />Emergency Services, per City of Pleasanton Municipal Code Section 2.44.050, is the City Manager, who <br />will determine if alternate options will be implemented. <br />4.2. Activations and Deactivation <br />EOC equipment is maintained by the Emergency Services Manager and may be used for coordination and <br />monitoring activities at any time without the need for a formal EOC activation. Depending upon the need <br />and circumstances, an official EOC activation may be appropriate to support various activities which may <br />include: <br />• Field response (disaster or major emergency) <br />• Planned events (conventions, parade, citywide event) <br />• Local proclamation of emergency <br />• Governor’s declaration of emergency <br />• Presidential Declaration of a national emergency <br />• State of War <br />The City Manager would typically assume the role as the initial EOC Director during an EOC activation. <br />For incidents or events that extend beyond an operational period (e.g., 12 hours), the City Manager may <br />designate an alternate or replacement EOC Director. This person could be the Assistant City Manager, <br />EOC Operations Section Chief, Emergency Services Manager, or a member of the City’s Executive Team. <br />Page 222 of 264