My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
100725 REGULAR
>
CITY COUNCIL REGULAR AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:27:07 PM
Creation date
10/10/2025 3:21:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2025
DESTRUCT DATE
15Y
DOCUMENT NO
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10/7/25
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br />OUTREACH <br />The public outreach for the playgrounds included sending out notification cards to all tenants <br />and property owners within 300 feet of Del Prado and Moller Parks, advertising the playground <br />renovation outreach meetings on the City’s social media, and posting signs at both parks <br />regarding the proposed playground renovation and inviting attendance for public meetings held <br />on site on Saturday, May 10, 2025. <br /> <br />Approximately two dozen people attended the on-site outreach meeting at Del Prado, and <br />about a dozen people attended the Moller outreach meeting. Of the attendees, approximately <br />half were children. <br /> <br />The primary comments the City received regarding the playgrounds are summarized here: <br /> <br />Del Prado <br />• Provide a tube slide (or partial tube slide) as a replacement for one of the slides <br />• Prefer the light blue option <br />• Provide rubber surfacing to the special swing and/or the spinner <br />• Incorporate a monkey bar somewhere <br />• Include shade <br />• Retain the existing concrete slide <br /> <br />Moller <br />• Incorporate a monkey bar/twirly bar somewhere <br />• Add a steering wheel panel to the tower <br />• Include the playful series sensory panels <br />• Use a colorful color palette for the play equipment <br />• Include shade <br /> <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton strategic plan goal of Investing <br />in Our Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP) <br />to complete design and construction of budgeted capital projects, and Strategy 7 – Continue to <br />invest in parks, bicycle, and pedestrian infrastructure, and public art to improve traffic safety, <br />promote climate resilience, and increase equitable access to cultural and recreational <br />opportunities. <br /> <br />FISCAL IMPACT <br />There is $550,000 in funding for the Annual Playground Renovations Project, CIP No. 25745, <br />to renovate playgrounds. The total anticipated expenditures for renovation of the Moller Park <br />playground are $184,044 (including project advertisement, agreement amount, and a roughly <br />10 percent project contingency), and return to fund balance $365,956 for future eligible <br />projects as outlined in Attachment 3. <br /> <br /> <br />Page 191 of 376
The URL can be used to link to this page
Your browser does not support the video tag.