My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
100725 REGULAR
>
CITY COUNCIL REGULAR AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:27:07 PM
Creation date
10/10/2025 3:21:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2025
DESTRUCT DATE
15Y
DOCUMENT NO
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10/7/25
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 4 <br />pieces of equipment at Del Prado have already failed and been removed, although staff was <br />able to replace two of them. Some of the decks and rails at Moller are rusting through and staff <br />have temporarily repaired them. Additionally, the plastic slide at Moller has started to crack and <br />the plastic equipment at Del Prado is showing signs of UV degradation. <br /> <br />Based on the available playground renovation budget of $550,000, staff recommended <br />renovating the Del Prado and Moller playgrounds to the Parks and Recreation Commission at <br />their meeting on February 13, 2025. The Parks and Recreation Commission recommended <br />proceeding with the renovation of the Del Prado and Moller playgrounds with the request that <br />more accessible features, such as rubber surfacing, be incorporated into the designs. <br /> <br />The City issued a Request for Qualifications (RFQ) for the playground renovation. The RFQ <br />was advertised on March 14, 2025. The City received five qualification packages on April 30 <br />from the following vendors: <br />• MRC Recreation <br />• Park Planet <br />• Ross Recreation <br />• Specified Play Equipment Company <br />• Zoom Recreation <br /> <br />The City’s selection committee selected Park Planet for the Del Prado and Moller playgrounds <br />based on the quality of design, the amount of equipment proposed for the money available, <br />and the capabilities of the company as reflected in the qualification package. <br /> <br />DISCUSSION <br />After receiving public input, staff met again with Park Planet to determine the best way to <br />incorporate the comments from the public while minimizing impacts to the project cost. Staff <br />and the consultant were able to accommodate almost all of the requests by rotating the play <br />equipment for better access and play. <br /> <br />Due to budget constraints, both playgrounds were prioritized and the damaged equipment at <br />Del Prado was replaced instead of the planned complete renovation that was included in this <br />project. The replacement of the damaged equipment is a temporary solution, and the <br />playground will still need to be renovated in the future. The final concept for the Moller Park <br />playground which incorporates the public input is shown in Attachment 1. <br /> <br />The professional services agreement with Park Planet, as shown in Attachment 2, totals <br />$166,251, which includes the final design per public input, fabrication and installation of the <br />play equipment, and associated engineered wood fiber and poured-in-place rubber surfacing <br />(PIP) installation. Staff recommends that City Council approve the agreement with Park Planet. <br />If approved, the equipment will be fabricated and then installed in Winter or Spring 2026. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the Climate Action Plan (CAP 2.0) in Transportation and Land <br />Use by providing greater park accessibility for all users. <br /> <br />Page 190 of 376
The URL can be used to link to this page
Your browser does not support the video tag.