Laserfiche WebLink
Attachment 1 Exhibit B <br />Page 12 of 64 <br />6. Frame Inspection. Framing inspections shall be made after the roof deck or sheathing are approved <br />and the structure is adequately protected from weather intrusion, all framing, fire-blocking and <br />bracing are in place, all pipes, chimneys and vents to be concealed are complete and the rough <br />electrical, plumbing, heating, wiring, piping and ducts are approved. Moisture content of framing <br />members shall be verified in accordance with the California Green Building Standards Code. <br /> <br />7. Sprinkler System Pre-Concealment Inspection. Fire sprinklers shall be installed in all required <br />locations, and the sprinkler piping installation shall be tested and inspected prior to the concealment <br />of any sprinkler system piping. <br /> <br />8. Energy Efficiency Inspections. Inspections shall be made to determine compliance with the <br />California Energy Code, Title 24, Part 6 and shall include, but not be limited to, inspections for: <br />envelope insulation R- and U-values, fenestration U-value, duct system R-value, and HVAC and <br />water-heating equipment efficiency. Wall and concealed ceiling insulation inspections are required <br />to be made after the frame inspection is approved and before being covered. <br /> <br />9. Lath and/or wallboard Inspection. Lath and gypsum board inspections shall be made after lathing <br />and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum <br />board joints and fasteners are taped and finished. <br /> <br />EXCEPTION: Gypsum board that is not part of a fire-resistance-rated assembly. <br /> <br />10. Fire-resistance-rated Construction Inspection. Wherever fire-resistance-rated construction is <br />required, the Building and Safety Official shall require an inspection of such construction after all <br />lathing and/or wallboard is in place, but before any plaster is applied, or before wallboard joints and <br />fasteners are taped and finished. Protection of joints and penetrations in fire-resistance-rated <br />assemblies, smoke barriers and smoke partitions shall not be concealed from view until inspected <br />and approved. <br /> <br />11. Weather-exposed balcony and walking surface waterproofing. Where balconies or other elevated <br />walking surfaces are exposed to water from direct or blowing rain, snow or irrigation, and the <br />structural framing is protected by an impervious moisture barrier, all elements of the impervious <br />moisture barrier system shall not be concealed until inspected and approved. <br /> <br /> EXCEPTION: Where special inspections are provided in accordance with California Building <br />Code Section 1705.1.1, Item 3. <br /> <br />12. Other Inspections. In addition to the inspections specified above, the Building and Safety Official is <br />authorized to make or require other inspections of any construction work to ascertain compliance <br />with the provisions of this code and other laws that are enforced by the department of building <br />safety. <br /> <br />13. Final Inspection. Final inspection shall be made after the permitted work is complete and prior to <br />occupancy. <br /> <br /> <br />Page 23 of 376