My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
100725 REGULAR
>
CITY COUNCIL REGULAR AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:27:07 PM
Creation date
10/10/2025 3:21:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2025
DESTRUCT DATE
15Y
DOCUMENT NO
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10/7/25
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 Exhibit B <br />Page 53 of 64 <br />Exceptions: <br />1. Nonresidential buildings containing kitchens located in a place of public accommodation, <br />as defined in the California Building Code Chapter 2, may apply to the local enforcing <br />agency for a modification to install commercial food heat-processing equipment served by <br />fuel gas. The local enforcing agency may grant the modification if they find: <br />a. A business-related need to cook with combustion equipment; and <br />b. The need cannot be achieved equivalently with an electric heating appliance; and <br />c. The applicant has installed energy efficient equipment based on Energy Star or <br />California Energy Wise qualifications, as available. <br />d. The applicant shall comply with Section 5.106.13.2. <br /> <br />2. Nonresidential buildings requiring industrial process heat, as defined in the California <br />Building Code Chapter 2, may apply to the local enforcing agency for a modification to <br />utilize fuel gas infrastructure for equipment requiring industrial process heat. The local <br />enforcing agency may grant the modification if they find: <br />a. A business-related need to use industrial process heat; and <br />b. The need cannot be achieved equivalently with an electric heating. <br />c. The applicant shall comply with Section 5.106.13.2. <br /> <br />3. If the applicant establishes that there is not an all-electric prescriptive compliance pathway <br />for the building under the California Building Energy Efficiency Standards, and that the <br />building is not able to achieve the performance compliance standard applicable to the <br />building under the Energy Efficiency Standards using commercially available technology <br />and an approved calculation method, then the local enforcing agency may grant a <br />modification. The applicant shall comply with Section 5.106.13.2 <br /> <br />Inactive Fuel Gas Infrastructure may be extended to spaces that are anticipated to qualify for the <br />exceptions contained in this chapter. The inactive Fuel Gas Infrastructure shall not be activated, have a <br />meter installed, or otherwise used unless the exemptions specified in this chapter have been confirmed as <br />part of the issuance of a building permit. If the Fuel Gas Infrastructure is no longer serving one of the <br />exceptions contained in this chapter, it shall either be capped, otherwise terminated, or removed by the <br />entity previously entitled to the exemption, in a manner pursuant to all applicable Codes. <br /> <br />Pleasanton shall have the authority to approve alternative materials, design and methods of construction <br />or equipment per California Building Code Section 104. <br /> <br />5.106.13.2. Requirements for combustion equipment. <br />Where combustion equipment is allowed per exceptions under Section 5.106.13.1, the construction <br />drawings shall indicate electrical infrastructure and physical space accommodating the future installation <br />of an electrical heating appliance in the following ways, as certified by a registered design professional <br />or licensed electrical contractor: <br />1. Branch circuit wiring, electrically isolated and designed to serve all electrical heating <br />appliances in accordance with manufacturer requirements and the California Electrical <br />Code, including the appropriate voltage, phase, minimum amperage, and an electrical <br />receptacle or junction box within five feet of the appliance that is accessible with no <br />obstructions. Appropriately sized conduit may be installed in lieu of conductors; and <br />2. Labeling of both ends of the unused conductors or conduit shall be with “For Future <br />Electrical Appliance”; and <br />Page 64 of 376
The URL can be used to link to this page
Your browser does not support the video tag.