My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
100725 REGULAR
>
CITY COUNCIL REGULAR AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:27:07 PM
Creation date
10/10/2025 3:21:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2025
DESTRUCT DATE
15Y
DOCUMENT NO
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10/7/25
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 Exhibit B <br />Page 52 of 64 <br />20.26.360 Table 5.106.5.1.1 amended – Raceway and panel power requirements for medium- and <br />heavy-duty EVSE. <br /> <br />Tables 5.106.5.1.1 is amended to read as follows: <br /> <br />TABLE 5.106.5.5.1.1, Raceway Conduit and Panel power Requirements for Medium-and-Heavy- <br />Duty EVSE <br /> <br /> <br /> <br />20.26.370 Section 5.106.13 added – All-electric buildings. <br /> <br />Section 5.106.13 is added to read as follows: <br /> <br />5.106.13 All-electric buildings. New construction buildings and qualifying alteration projects shall <br />comply with Section 5.106.13.1 or 5.106.13.2 so that they do not use combustion equipment or are ready <br />to facilitate future electrification. <br /> <br />5.106.13.1. New construction and qualifying alteration projects. All newly constructed buildings shall <br />be all-electric buildings. Alterations that include replacement of over 50 percent of the existing <br />foundation for purposes other than a repair or reinforcement as defined in California Existing Building <br />Code Section 202; or where over 50 percent of the existing framing above the sill plate is removed or <br />replaced for purposes other than repair, shall be all-electric buildings. If either of these criteria are met <br />within a three-year period, measured from the date of the most recent previously obtained permit final <br />date, the project shall be subject to the all-electric buildings requirements. <br /> <br />Tenant improvements shall not be considered new construction. The final determination whether a project <br />meets the definition of substantial reconstruction/alteration shall be made by the local enforcing agency. <br /> <br />Building type Building Size <br />(sq. ft.) <br />Number of Off-street <br />loading spaces <br />Additional capacity Required (kVa) <br />for Raceway & Busway and <br />Transformer & Panel <br />Grocery 10,000 to 90,000 1 or 2 200 <br />Grocery Greater than <br />90,000 <br />3 or Greater 400 <br />Grocery Greater than <br />90,000 <br />1 or Greater 400 <br />Retail 10,000 to 135,000 1 or 2 200 <br />Retail 10,000 to 135,000 3 or Greater 400 <br />Retail Greater than <br />135,000 <br />1 or Greater 400 <br />Warehouse <br />Warehouse <br />Warehouse <br />20,000 to 256,000 <br />20,000 to 256,000 <br />1 or 2 200 <br />3 or Greater 400 <br />Greater than <br />256,000 <br />1 or Greater 400 <br />Page 63 of 376
The URL can be used to link to this page
Your browser does not support the video tag.