Laserfiche WebLink
City of Pleasanton | Stormwater System Management Plan | PWD 25.601 | PAGE 14  <br />Wood Rodgers will employ this customized tool to automate catchment  <br />delineation for 70 miles of storm drain pipes. The tool will encompass  <br />topographic resolutions ranging from steep valleys and incised channels to  <br />detailed curb, gutter, and street crown geometries, including the connectivity of  <br />storm drains and channels. It will be utilized to embed storm drain and channel  <br />networks into a newly‐created LiDAR Digital Elevation Model (DEM),  <br />subsequently creating sub‐catchments at the confluences of lateral storm drains  <br />and trunks, major trunk confluences, and upstream ends of storm drain  <br />systems.  <br />The catchment delineation tool will leverage the latest land use and soil maps in  <br />conjunction with sub‐catchment delineations to develop hydrologic parameters,  <br />including hydrologic soil groups, slope, impervious coverage, flow path  <br />roughness, and overland flow length. Catchments will be developed and analyzed for existing and future general plan land use (See  <br />Exhibit 11).  <br />Deliverable(s): Catchment boundaries and hydrologic parameters for 70 miles of pipes in existing and future land use conditions |  <br />Updated geodatabase  <br />Task 3.2 – Hydraulic 1D and 2D Models <br />Wood Rodgers proposes to develop the following: 1) a detailed and fully integrated one‐dimensional (1D) model for 70 miles of storm  <br />drainpipes with a diameter that is equal to or greater than 24 inches; 2) 30 miles of open channel; 3) detention basins/lakes; 4) pump  <br />stations; and 5) a two‐dimensional (2D) floodplain model. The models will reflect the hydraulic interactions between storm drains and  <br />open channels, storm drains and a 2D floodplain, open channels and a 2D floodplain, and storm drains/open channels. The model  <br />will have enough resolution to reflect all flood water performance within the drainage facilities in the City and to understand or  <br />pinpoint the true capacity deficiency without model simplification.  <br />A detailed and accurate open channel model is crucial to understanding the true capacity and deficiencies of the entire storm drain  <br />system, and even to understanding the maintenance requirements. The Zone 7 HEC‐RAS model geometry will be imported into the  <br />ICM model to provide accurate and dynamic tailwater conditions for the storm drain systems, and also to account for any overbank  <br />spills. Detailed channel overbank elevation profiles will be constructed to reflect accurate channel and 2D floodplain interaction  <br />during overbank flooding. The detailed open channel model can also be used to assess the necessary frequency and extent of  <br />vegetation maintenance and the corresponding hydraulic impacts.  <br />Wood Rodgers will develop 2D meshes to model floodplains up to a 100‐year storm. A detailed flexible mesh will be developed and  <br />adjusted to capture the terrain resolution for street areas where conveyance and storage is important. The City’s drainage facilities  <br />include both storm drains and street networks. The interaction between the two systems should be hydrodynamically modeled to  <br />properly assess the true combined drainage capacity. This complex (accurate), and flexible model will serve as a basis for the City for  <br />years to come.  <br />Deliverable(s): Storm drains (up to 70 miles) and open channels (up to 30 miles) in 1D and 2D hydraulic models  <br />Task 3.3 – Regional Green Infrastructure and Trash Capture Device Modeling <br />Green infrastructure (GI) and large trash capture devices are effective solutions for improving water quality and meeting Municipal  <br />Regional Permit requirements. However, storm drain master plans often overlook the hydraulic impacts and benefits of green  <br />infrastructure. At Wood Rodgers, we have access to gage data on green infrastructure and large trash capture devices and we are  <br />thoroughly familiar with the performance of these facilities. With this knowledge, we are well‐equipped to accurately assess the  <br />performance of these facilities and to clearly present this information in the capital improvement plan.  <br />Large trash capture devices typically reduce existing storm drain capacity and will be modeled to determine the impacts to the  <br />hydraulic performance with the consideration of debris clogging. The facilities will be modeled and adjusted with a debris clogging  <br />factor and reduced performance efficiency. In contrast, LIDs, hydromodification facilities, and regional stormwater capture facilities  <br />reduce runoff and increase storm drain capacity. Including these facilities will reduce the extent of capital improvements for capacity.  <br />Under Task 7.2, Wood Rodgers Team member Geosyntec will conduct a GIS analysis to identify possible locations of future citywide  <br />GI. GI facility footprints and types will be developed for GSI opportunity locations based on preliminary sizing factors. Geosyntec will  <br />also work with Wood Rodgers H&H modelers to accurately represent facilities in their model.  <br />Wood Rodgers will model and optimize the design parameters for up to two identified large trash capture devices, hydromodification  <br />facilities, or regional stormwater capture facilities. A 10% level of detail conceptual designs and construction cost estimates will be  <br />developed subsequent to the modeling efforts for project implementation or grant applications.  <br />Deliverable(s): Modeling, conceptual designs, and construction cost estimates for up to two (2) Large trash capture,  <br />hydromodification, or regional stormwater capture facilities  <br />Exhibit 11  <br />EXHIBIT A <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8