Laserfiche WebLink
City of Pleasanton | Stormwater System Management Plan | PWD 25.601 | PAGE 20  <br />Task 5.2 –Improvement Alternatives and Costs <br />Wood Rodgers will develop and model up to two conceptual alternatives for up to five  <br />major storm drain systems with deficiencies (as appropriate) to optimize proposed  <br />improvements. Alternatives will depend upon the circumstances, but could include new  <br />or upsized storm drainage pipes, diversions, detention, floodwalls, pump station  <br />improvements, etc. (See Exhibit 16)  <br />The improvement alternatives will be developed based on a watershed‐wide approach  <br />rather than individually. This is necessary because a comprehensive capital improvement  <br />plan must demonstrate that alleviating deficiencies in one location will not exacerbate  <br />problems elsewhere in the system. Potential projects will be proposed to address  <br />areas with the largest risk factors. Deliberate effort will be given to proposing potential  <br />projects to incorporate in part or in totality a green infrastructure, if feasible.  <br />Each alternative will be presented as a preliminary plan view drawing with preliminary  <br />designs, permitting, capital, administration, and management costs. Capital costs will be  <br />developed using detailed and current contractor bids to provide realistic estimates for  <br />the City’s financial resource planning. (See Exhibit 17)  <br />Potential projects will be presented for discussion in a workshop setting with  <br />the City staff. This will allow for key‐staff input and allow the creation of in‐ <br />depth justification.  <br />Deliverable(s): Conceptual design figures and costs for up to 5 projects  <br />Exhibits 16 & 17  <br />Task 5.3 – Benefit Cost Analysis and Improvement <br />Prioritization <br />Using the criteria developed in Task 5.1, Wood Rodgers, in collaboration with  <br />the City and community stakeholders, will prioritize the improvement projects  <br />developed in Task 5.2 (see Exhibit 18). Other additional considerations may  <br />include, but are not limited to, environmental benefits, constructability, and  <br />funding availability.  <br />Exhibit 18  <br />The metrics of success will be assigned with weighting factors based on input from the City and the stakeholders. The improvement  <br />projects with higher combined scores will be recommended over those with lower scores for CIP implementation. The project  <br />priority rankings will be finalized through discussions with the City to incorporate their priorities and local experience.  <br />The project priority rankings and project costs will be used collectively to categorize improvement projects into 5‐year (urgent), and  <br />10‐year (low priority) planning‐ level capital improvement projects based on the City’s  <br />existing or planned financial resources.  <br />Once the improvement projects are prioritized, Wood Rodgers will summarize the  <br />hydrologic and hydraulic results of the drainage area, the improvement extent and  <br />cost, and the effectiveness of the improvements, by comparing the existing and post‐  <br />improvement floodplains for each of the selected improvement projects. (See Exhibit  <br />19).  <br />Deliverable(s): Prioritized 5 capital improvement projects | CIP implementation  <br />schedule.  <br />Exhibit 19  <br />EXHIBIT A <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8