My WebLink
|
Help
|
About
|
Sign Out
ITEM 5 EXHIBITS A-H
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
ITEM 5 EXHIBITS A-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:53:56 PM
Creation date
11/7/2025 5:11:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4400 Black Avenue Redevelopment – Transportation Assessment January 8, 2025 <br />5 <br /> <br />• An intersection projected to operate at LOS E or LOS F before the addition of project traffic, <br />the project adds 10 or more vehicle trips; or, <br />• Deterioration of controlled movement at an unsignalized intersection from LOS E or better to <br />LOS F, or at unsignalized intersections where a controlled movement already operates at LOS <br />F and results in one of the following: <br />o Project traffic results in a volume that meets the peak hour traffic signal warrant; or, <br />o Where the peak hour signal warrant is met without the project and delay cannot be <br />measured, project traffic increases the volume by 10 or more vehicles per lane on the <br />controlled approach; or, <br />o Project traffic increases the average delay to a minor movement by more than 30 <br />seconds. <br />Existing Conditions <br />The existing operations of the study intersection was evaluated for the highest one-hour volumes <br />during the weekday morning and evening peak periods. City provided the turning movement counts <br />for vehicles, bicycles, and pedestrians were conducted during the AM peak period (7:00 AM to 9:00 <br />AM) and PM peak period (4:00 PM to 6:00 PM) at the study intersections. Counts were conducted on <br />a typical mid-weekday during February 27th, 2024, when local schools were in session. <br />Figure 1 illustrates the Existing lane geometry and traffic control at the study intersection. <br />Figure 2 illustrates the Existing AM and PM peak hour vehicle turning movement volumes at the study <br />intersection. <br />Attachment 1 includes the Existing traffic count data sheets and count dates for the collected vehicle, <br />bicycle, and pedestrian counts. <br />Attachment 2 includes the peak hour intersection analysis Synchro worksheet results of Existing <br />Conditions. <br />The intersection LOS analysis results for Existing Conditions are summarized in Table 2. <br />As shown in Table 2, the study intersection is operating at an acceptable LOS “D” or better during the <br />analyzed peak hours. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.