My WebLink
|
Help
|
About
|
Sign Out
ITEM 5 EXHIBITS A-H
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
ITEM 5 EXHIBITS A-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:53:56 PM
Creation date
11/7/2025 5:11:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4400 Black Avenue Redevelopment – Transportation Assessment January 8, 2025 <br />18 <br /> <br />Figure 6: Excerpt of Vesting Tentative Map, Sheet 8 (July 5, 2023) <br /> <br />Source: CBG Civil Engineers <br />Alternative Modes of Transportation <br />The following section provides additional analysis of non-vehicular transportation components of the <br />Project, including pedestrian impacts, bicycle impacts, and transit impacts. <br />PEDESTRIAN IMPACTS <br />Currently, the area near the project site is relatively built out. The area provides a broad range of <br />harmonious uses including residential, commercial, schools, and parks. The site is also located <br />approximately one (1) mile from Pleasanton’s downtown area. Concrete sidewalks exist along both <br />sides of Black Avenue. The nearest crosswalk over Black Avenue is located at Cedarwood Lane <br />(approximately 100 feet east of the project site). The signalized intersection of Santa Rita Road and <br />Black Avenue provides countdown pedestrian signal heads, marked yellow crosswalks, and tactile <br />walking surface indicators on all four intersection legs to help pedestrian circulation and accessibility. <br />The Project will modify the existing sidewalk along the project site frontage by removing one (1) <br />existing tree and by planting six (6) new trees. Further modifications will consist of the accommodation <br />of the planned driveway access configuration from two (2) existing driveways to one (1) planned <br />driveway that will connect to Street A. Additionally, the Project will incorporate pedestrian connectivity <br />from the project site to the pedestrian network along Black Avenue through the development of <br />internal pedestrian pathways contiguous to Street A.
The URL can be used to link to this page
Your browser does not support the video tag.