My WebLink
|
Help
|
About
|
Sign Out
ITEM 5 EXHIBITS A-H
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
ITEM 5 EXHIBITS A-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:53:56 PM
Creation date
11/7/2025 5:11:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
JKWONG
Created:
11/7/2025 5:53 PM
Modified:
11/7/2025 5:53 PM
Text:
https://cleanwaterprogram.org/development/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 26 <br /> <br />along the Black Avenue frontage of the property. PG&E requires a safe working <br />clearance from active overhead lines depending on the nominal line-voltage of the <br />suspended wires. Because the proposed height of the building will place the northern <br />exterior walls in close proximity to the electrical lines, the applicant shall determine the <br />required setback from the suspended wires. A PG&E letter confirming the setback is <br />required to be submitted to the City. If the required setback from PG&E overhead line <br />is not achieved, the applicant shall either adjust the locations of the buildings to <br />achieve compliance, or shall place said joint utility pole facilities underground. <br />(Address this condition prior to plan approval). <br /> <br />90. SANITARY SEWER NETWORK. Capacity in the City’s sanitary sewer network to <br />serve the subject development must be verified by running a scenario in the City’s <br />network computer model. The computer model is operated by a consultant retained <br />by the City. The consultant will run the scenario and then issue a report with their <br />findings. The applicant shall fund this effort and address any discovered network <br />deficiencies that are directly attributable to the development. <br /> <br /> It is assumed that the existing building is served from a sanitary sewer lateral <br />connected to the City’s main. If this lateral will no longer serve the site, it shall be <br />decommissioned at the main, with the pipe abandoned in accordance with Pleasanton <br />Standard Specification Section 3-03H “Utility Abandonment”. (Address this condition <br />prior to plan approval) <br /> <br />91. CLEAN WATER PROGRAM (LARGE PROJECTS). Because the project appears to <br />create and/or replace more than 10,000 square feet (0.23 acres) of impervious <br />surface, it is considered a Regulated Project according to Provision C.3.b of the <br />Municipal Regional Stormwater NPDES Permit that regulates stormwater runoff in <br />Alameda County. The Alameda Countywide Clean Water Program developed a C.3 <br />Guidance Manual to assist applicants in addressing these regulations. The Guidance <br />Manual is available for download at: <br /> https://cleanwaterprogram.org/development/ <br /> <br /> Regulated projects must include stormwater treatment measures in the site design to <br />remove pollutants from stormwater upstream of any connection to the City’s <br />stormwater conveyance networks. In addition, regulated projects must be subject to a <br />Stormwater Treatment Measure Maintenance Agreement between the City and <br />property owner or owner’s association to assure long-term maintenance of the <br />installed measures. The City will provide a template agreement. Once executed, the <br />agreement must be recorded against the property. (Address this condition prior to plan <br />approval) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.