My WebLink
|
Help
|
About
|
Sign Out
ITEM 5 EXHIBITS A-H
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
ITEM 5 EXHIBITS A-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:53:56 PM
Creation date
11/7/2025 5:11:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 34 <br /> <br />retroreflective with visibility from a minimum 1,000 feet. (Address this condition during <br />construction) <br /> <br />116. EXCAVATION SAFETY. All excavations must be performed in conformance with <br />California Government Code Section 4216 et seq. No excavation shall occur until <br />proper notice is provided to Underground Service Alert (usanorth811.org) by calling <br />either 811 or 800-642-2444 at least 72-hours prior to the work so buried utilities can be <br />marked. All excavations shall be covered or barricaded to prevent entry when work is <br />inactive. Open excavations in the public right-of-way must be covered by skid- <br />resistant steel plates that are firmly affixed to the surface with leading edges ramped. <br />Excavations 5-feet and deeper require a protective system as defined by Cal-OSHA. <br />If a shoring system or trench boxes will be utilized as the protective system, said <br />system shall either be manufactured and installed according to manufacturer <br />recommendations, or designed by a registered professional engineer and installed <br />according to approved plans. No excavation shall be performed atop or adjacent to a <br />high-risk facility until authorized by the owner of the facility. High-risk facilities are <br />defined as gas transmission pipelines and hazardous liquid pipelines as regulated by <br />the U.S. Department of Transportation Pipeline and Hazardous Materials Safety <br />Administration (US DOT PHMSA). (Address this condition during construction) <br /> <br />117. POLLUTANT REDUCTION IN STORMWATER. At no time during construction of the <br />project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe <br />networks or open stormwater channels in violation of Pleasanton Municipal Code <br />§9.14.080 et seq. The applicant shall contain all trash and debris for proper disposal <br />to authorized landfills or recyclers. Erosion control features shall be deployed during <br />the rainy season that extends from October 1st to April 15th each year, or any time rain <br />is forecast outside of this period. Best Management Practices (BMPs) shall be strictly <br />followed. Street sweepers must be employed if soil or debris is tracked onto the <br />public roads from vehicles exiting the site. Standard BMPs are available from the <br />California Stormwater Quality Association (CASQA), the United States Environmental <br />Protection Agency (EPA), Caltrans, and others. Notes and/or illustrations shall be <br />added to the plans that describe the BMPs to be utilized during construction. The use <br />of manufactured erosion control woven blankets and straw wattles that utilize plastic <br />monofilament netting is specifically prohibited. (Address this condition during <br />construction) <br /> <br />118. SWPPP REPORTING. Copies of any monitoring and/or sampling reports required by <br />the stormwater pollution prevention plan (SWPPP) and submitted by the Legally <br />Responsible Person (LRP) to the State of California’s SMARTS database shall also <br />be submitted to the City of Pleasanton inspector assigned to the project. The LRP <br />shall also submit to the City a copy of the required Annual Report no later than <br />September 1st of each year that construction is active or when erosion control features <br />have been deployed. The report must include a summary of all sampling and analysis
The URL can be used to link to this page
Your browser does not support the video tag.