Laserfiche WebLink
<br />Page 35 <br /> <br />performed (Risk Levels 2 and 3 only), a log of all inspections performed, a summary of <br />any required corrective actions taken, and a summary of any violations. (Address this <br />condition during construction) <br /> <br />119. DUST CONTROL. Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All stockpiles or <br />unused materials that can create dust shall be covered or removed. Exposed soil <br />areas shall be routinely watered until surfacing materials or landscaping is installed. <br />Use of dust palliatives shall conform to Caltrans Standard Specification Section 18. <br />Any damage caused by airborne dust to neighboring properties shall be cleaned with <br />costs paid by the applicant. If the applicant fails the address dust as directed by the <br />City, the City shall have the right to enter the property to effectuate the correction, with <br />all costs paid by the applicant or levied as a lien against the applicant’s property. <br />(Address this condition during construction) <br /> <br />120. PROPERTY NUISANCE. At no time during construction of the project shall the <br />condition of the property become a nuisance as defined in Pleasanton Municipal Code <br />§9.28.020. The City shall have the right to inspect the property for conditions that <br />violate the code standard. If a nuisance is found, the applicant shall immediately <br />submit a plan of correction. Depending on the severity of the nuisance, the City may <br />suspend all construction work until the condition is corrected. Any of the following <br />conditions shall be considered severe: Leaking chemicals that can cause <br />environmental damage; open excavations or any excavation deeper than 4 feet that <br />lacks proper shoring; unsecured materials that can fall to the ground causing damage <br />or injury; open or exposed utilities that could cause electrical shock or contamination <br />of sewer, potable water systems, groundwater wells, or storm drainage networks. If <br />the applicant fails the address the nuisance as directed by the City, the City shall have <br />the right to enter the property to effectuate the correction, with all costs paid by the <br />applicant or levied as a lien against the applicant’s property. (Address this condition <br />during construction) <br /> <br />121. NOISE. Construction noise is regulated under Pleasanton Municipal Code Chapter <br />9.04. Noise is prohibited outside of the hours of 8:00 am and 8:00 pm daily except <br />Sundays and holidays when noise is prohibited outside the hours of 10:00 am and <br />6:00 pm. Noise is defined as a level exceeding 83 dBA at a distance of 25 feet or 86 <br />dBA at any point beyond the boundary of the property under construction. If the <br />applicant fails the address the noise as directed by the City, the City shall have the <br />right to enter the property to effectuate the correction, with all costs paid by the <br />applicant or levied as a lien against the applicant’s property. Exceptions to these <br />regulations require a special permit granted by the City for circumstances when strict <br />compliance would be impractical or unreasonable, and contingent upon proper <br />noticing to surrounding property owners that includes the dates and times when noise