My WebLink
|
Help
|
About
|
Sign Out
ITEM 5 EXHIBITS A-H
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
ITEM 5 EXHIBITS A-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:53:56 PM
Creation date
11/7/2025 5:11:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
JKWONG
Created:
11/7/2025 5:53 PM
Modified:
11/7/2025 5:53 PM
Text:
https://www.cityofpleasantonca.gov/gov/depts/gis.asp
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 36 <br /> <br />levels will be exceeded and the specific reasons why an exception to the regulation <br />has been granted. (Address this condition during construction) <br /> <br />122. DROUGHT RESTRICTIONS. If the City Council declares a drought during a time <br />when this development is under construction, as described in §9.30.010 et seq. of the <br />Pleasanton Municipal Code, the applicant shall utilize only recycled water under Stage <br />1 or greater restrictions for all non-potable construction-related water needs. <br />Recycled water is available at designated locations within the City, subject to the <br />applicant’s receipt of a temporary hydrant meter from the Operations Service Center <br />located at 3333 Busch Road. The applicant is responsible for all water costs based <br />on current billing rates. (Address this condition during construction) <br /> <br />123. GEOTECHNICAL FINAL REPORT. At the conclusion of construction, the applicant <br />shall submit to the City a final report from the Geotechnical Engineer or Certified <br />Engineering Geologist testifying to the successful completion of all material testing <br />and/or observation work performed. The final report must provide assurance that all <br />recommendations had been strictly followed. The applicant shall bear all costs <br />associated with this condition. (Address this condition prior to acceptance of <br />improvement or issuance of an Occupancy Permit) <br /> <br />124. GEOGRAPHIC INFORMATION SYSTEMS. The City’s Geographic Information <br />Systems (GIS) staff publishes digital maps that enable first responders to efficiently <br />navigate to locations where calls for service have been requested. The maps are also <br />shared with agencies and departments that provide other critical services to residents <br />such as mail delivery. To keep these maps current, the City requires as-built plan or <br />map information to be submitted by the applicant in a format that integrates with <br />ArcGIS by ESRI. The “Digital Submittal Requirements” are available for download at <br />the following weblink: <br /> <br />https://www.cityofpleasantonca.gov/gov/depts/gis.asp <br />(Address this condition prior to acceptance of improvement or issuance of an <br />Occupancy Permit) <br /> <br />125. DAMAGE TO EXISTING PUBLIC OR PRIVATE IMPROVEMENTS. The applicant <br />shall repair damage to existing public or private improvements on and near the project <br />site and along the haul route at the applicant’s expense if caused by construction <br />activities <br /> <br />END
The URL can be used to link to this page
Your browser does not support the video tag.