My WebLink
|
Help
|
About
|
Sign Out
4 LEAF, INC. (#2026117)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
0-100
>
4 LEAF, INC. (#2026117)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:41:56 AM
Creation date
11/21/2025 11:40:27 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
4 LEAF, INC.
Contract Record Series
704-05
Munis Contract #
2026117
Contract Expiration
6/30/2028
NOTES
PLAN REVIEW, PERMIT COUNTER AND INSPECTION SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />SECTION F: COST PROPOSAL <br />A) Plan Check Services <br />1. Plan Review Level “A” – $160 per Hourly Fee (not to exceed 65% of Plan Review <br />Fee) <br />Complete structural and nonstructural building and fire/life safety plan review, including <br />CBC, CRC, CMC, CPC, CEC (California Electrical Code), CFC, California Energy <br />Efficiency Standards, CALGreen, (California Green Building Code), Stormwater <br />treatment and/or management, and City of Pleasanton specific regulations and policies, as <br />applicable. <br />2. Plan Review Level “B” – $160 per Hourly Fee (not to exceed 55% of Plan Review <br />Fee) <br />Complete nonstructural building plan review including CBC, CRC, CMC, CPC, CEC <br />(California Electrical Code), CFC, California Energy Efficiency Standards, CALGreen, <br />(California Green Building Code), Stormwater treatment and/or management, and City of <br />Pleasanton specific regulations and policies, as applicable. <br />3. Plan Review Level “C” – $160 per Hourly Fee (not to exceed 40% of Plan Review <br />Fee) <br />Complete structural building plan review including CBC, CRC and City of Pleasanton <br />specific regulations and policies, as applicable. <br />4. Plan Review Level “D” <br />$150.00 Hourly fee for nonstructural plan review services. <br />5. Plan Review Level “E” <br />$160.00 Hourly fee for structural plan review services. <br />6. Plan Review Level “F” – $160 per Hourly Fee (not to exceed 3 0% of Plan Review <br />Fee) <br />Complete fire sprinkler, fire alarm, commercial hood or hazardous material plan review <br />of all Fire Permits, including CFC, and City of Pleasanton and Livermore-Pleasanton Fire <br />Department specific regulations and policies, as applicable. <br />Level A <br />Review <br />Level B <br />Review <br />Level C <br />Review <br />Level D <br />Review <br />Level E <br />Review <br />Level F <br />Review <br />(Complete <br />Structural <br />& Non- <br />Structural <br />(Complete <br />Non- <br />Structural <br />Review) <br />(Complete <br />Structural <br />Only Review) <br />(Hourly Fee <br />for Non- <br />Structural <br />Review) <br />(Hourly Fee <br />for <br />Structural <br />Review) <br />(Complete <br />Fire <br />Sprinkler, <br />Alarm, <br />Exhibit B <br />Docusign Envelope ID: 01B6D925-128C-47DC-8A81-B94725D24082Docusign Envelope ID: 6EC19201-69F4-4A1B-96F3-B62485F06EF1
The URL can be used to link to this page
Your browser does not support the video tag.