Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Air Quality <br /> <br /> <br />FirstCarbon Solutions 3.2-25 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-02 Air Quality.docx <br />• For consistency with Clean Air Plan Measures BL4 and NW2, the proposed project would also <br />incorporate native and native-type species that are drought-tolerant and wind resistant to <br />conserve water use. According to applicant-provided site plans, ample tree planting will occur <br />within the residential lots. In addition, the proposed project would conserve 69.30 acres of <br />open space to be dedicated to the East Bay Regional Park District for preservation in <br />perpetuity. <br />• For consistency with Clean Air Plan Measures WA3 and WA4, the proposed project would <br />utilize a waste service provider compliant with AB 341, SB 939, and SB 1374 requirements. <br />• For consistency with Clean Air Plan Measure SS36, the proposed project would comply with <br />fugitive dust emissions minimization requirements established in Municipal Code Section 20- <br />30.090, Performance Standards for All Development and Land Uses. In addition, IMAIR-1 <br />would require the proposed project to incorporate BAAQMD’s Basic Construction Mitigation <br />Measures. <br />• For consistency with Clean Air Plan Measure SS37, the proposed project would utilize asphalts <br />subject to BAAQMD Regulation 8, Rule 15-Emulsified and Liquid Asphalts. The use of asphalts <br />under this regulation would limit the reactive organic gas (ROG) content in the asphalt. <br />• For consistency with Clean Air Plan Measure TR9, the proposed project would include the <br />striping of a 6-foot-wide bicycle lane on both sides of Dublin Canyon Road along the project <br />frontage and the construction of these bike lanes with the widening of Devany Creek bridge. <br />In addition, the project proposes the construction of sidewalks along Street A, Street B, and <br />Court C. The project also proposes the construction of a 5-foot-wide sidewalk along the front <br />of Lot 30 along Dublin Canyon Road along with a pedestrian crossing at Canyon Meadows that <br />would facilitate access to the proposed East Bay Regional Park District trailhead. Crosswalks <br />are also proposed to be constructed within the project site to facilitate pedestrian access <br />sitewide. <br /> <br />In summary, the proposed project would not conflict with any applicable measures under the 2017 <br />Clean Air Plan after implementing IM AIR-1; therefore, the proposed project would be consistent <br />with Criterion 3. <br />Summary <br />As addressed above, the proposed project would not conflict with the 2017 Clean Air Plan and meets <br />all three criteria set forth by BAAQMD for demonstrating consistency. Therefore, impacts associated <br />with conflicting with or obstructing the 2017 Clean Air Plan's implementation would be less than <br />significant. <br />Implementing Measures <br />IM AIR-1 The following measures shall be implemented during all phases of construction to <br />control dust and exhaust at the project site: <br />• Water active construction areas at least twice daily or as often as needed to <br />control dust emissions.