My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Biological Resources Draft EIR <br /> <br /> <br />3.3-36 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-03 Bio Resources.docx <br />need relocating. The survey shall encompass all construction zones and surrounding <br />lands within 50 feet. If no woodrat nests are present, no additional measures are <br />required. <br />A report shall be prepared for submission to the City summarizing the results of the <br />survey which identifies any buffer zones and outlines recommended next steps, <br />including measures implemented to prevent impacts to San Francisco dusky-footed <br />woodrats. <br />Nest deconstruction <br />Identified nests shall be avoided, where possible. If avoidance is not possible, as <br />determined by a qualified Biologist in coordination with the applicant, the nest(s) <br />will be manually deconstructed by a qualified Biologist when helpless young are not <br />present, typically during the nonbreeding season (October through January). The <br />nest will be reconstructed in a nearby suitable area. <br />Construction-free buffers <br />If it is determined during the pre-construction survey that young may be present, a <br />suitable buffer, delineated with flagging, depending on the timing within the <br />breeding season (ranging from 15–50 feet) will be established around the nest by <br />the qualified Biologist and maintained during construction until the young are <br />independent and have successfully moved from the nest on their own. <br />MM BIO-1h Mitigation Measure for Ringtails <br />Pre-construction Survey <br />A qualified Biologist shall conduct pre-construction surveys for the ringtail prior to <br />any disturbance to the property. All suitable areas within the project site shall be <br />surveyed with walking transects within 2 days prior to the onset of construction. <br />This survey can be conducted in conjunction with other pre-construction surveys. <br />Tailgate Training <br />All workers on the project and access corridor shall attend a tailgate training that <br />includes a description of the species, summary of its biology, and minimization <br />measures and instructions on what to do if a ringtail is observed. <br />Protective Measures for Individuals <br />In the event an individual is discovered within a construction zone on-site, <br />construction would be halted until the individual self-relocates from the project site. <br />A ringtail would not be expected to be residing within the area of development; <br />therefore, self-relocation is believed to be inevitable. Once the Biologist has <br />determined that the animal has moved outside of potential danger, construction <br />activities could resume. If the ringtail is found to be residing within a construction <br />zone on-site, an appropriate construction-free buffer (to be determined by a <br />qualified Biologist) would be established around the area being used by the ringtail
The URL can be used to link to this page
Your browser does not support the video tag.