My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Biological Resources <br /> <br /> <br />FirstCarbon Solutions 3.3-37 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-03 Bio Resources.docx <br />until the nest is abandoned by adult(s) and young for the year (approximately after <br />September). <br />MM BIO-1i Avoidance and Minimization Measures for Burrowing Owls <br />To avoid potential impacts to active burrowing owl nests and adult owls, a qualified <br />Biologist shall conduct pre-construction surveys for burrowing owls within the <br />construction footprint and within 250 feet of the footprint no more than 7 days prior <br />to project ground disturbance during the early part of breeding season (i.e., <br />February 1 through April 30), and no more than 30 days prior to onset of ground <br />disturbance during any other times of year. These surveys shall be conducted in a <br />manner consistent with accepted burrowing owl survey protocols. Specific <br />Avoidance and Minimization Measures for the burrowing owl are reported in Table <br />3-3 of the East Alameda County Conservation Strategy (EACCS). These measures are <br />mandatory for mitigation and include: <br />• If an active nest is identified near a proposed work area work will be conducted <br />outside of the nesting season (March 15 to September 1). <br />• If an active nest is identified near a proposed work area and work cannot be <br />conducted outside of the nesting season, a no-activity zone shall be established <br />by a qualified Biologist. The no-activity zone shall be large enough to avoid nest <br />abandonment and will at a minimum, be 250-feet radius from the nest. <br />• If the burrowing owls are present at the project site during the nonbreeding <br />period, a qualified Biologist shall establish a no-activity zone of at least 150 feet. <br />• If an effective no-activity zone cannot be established in either case, an <br />experienced burrowing owl Biologist shall develop a site-specific plan (i.e., a plan <br />that considers the type and extent of the proposed activity, the duration and <br />timing of the activity, the sensitivity and habituation of the owls, and the <br />dissimilarity of the proposed activity with background activities) to minimize the <br />potential to affect the reproductive success of the owls. <br /> <br />Compensation <br />To ensure that mitigation habitat meets or exceeds the value of habitat lost to <br />development, Focal Species Impact/Mitigation Scoring Sheets located in Appendix E <br />of the EACCS were used as part of the assessment for suitability of mitigation lands <br />for the burrowing owl. Standardized mitigation ratios for the burrowing owl, <br />according to Table 3-10 in the EACCS, is 3:1 within the East Bay Hills Mitigation Area <br />where the project and associated conservation land is sited. <br />Level of Significance After Mitigation <br />Less than significant impact.
The URL can be used to link to this page
Your browser does not support the video tag.