My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Biological Resources <br /> <br /> <br />FirstCarbon Solutions 3.3-41 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-03 Bio Resources.docx <br />Wetlands and Jurisdictional Features <br />Impact BIO-3: The proposed project would not have a substantial adverse effect on State or <br />federally protected wetlands (including, but not limited to, marsh, vernal pool, <br />coastal, etc.) through direct removal, filling, hydrological interruption, or other <br />means. <br />Impact Analysis <br />A formal wetland delineation has been conducted on the project site in 2016 and 2023. The USACE <br />has issued a Jurisdictional Determination which determined that jurisdictional waters of the United <br />States are present on the site in the form of Devaney Creek and its unnamed tributary to the extent <br />of the OHWM on opposing banks. Additionally, the USACE determined that approximately 0.42 acre <br />of seasonal wetlands identified in the northern portion of the site near Dublin Canyon Road were <br />isolated and non-jurisdictional. The USACE issued a PJD August 15, 2024, which accepted all aquatic <br />features identified on the map as jurisdictional including seasonal wetlands (0.54 acre), tributary <br />waters (1.48 acres and 6,997 linear feet), seasonal wetland gulley (0.001 acre and 71 linear feet), and <br />a roadside ditch (0.06 acre and 266 linear feet). <br />All waters identified on the site including the creeks, ephemeral tributaries, and the seasonal <br />wetlands would be subject to the regulatory authority of the RWQCB. The creeks on the site would <br />also be considered jurisdictional by CDFW. <br />All of Devaney Creek and its unnamed tributary will be preserved by the proposed project with a <br />setback. The project is already sited to avoid and minimize impacts to Devaney Creek and its <br />unnamed tributary; however, complete avoidance of the seasonal wetlands will not be due to the <br />siting of the entrance road in the northern portion of the site. <br />Approximately 0.25 acre of seasonal wetland on the site would be filled under the proposed project <br />due to the entrance road from Dublin Canyon Road. Although these wetlands are densely vegetated <br />by non-native species and appear to provide similar functions and value as the upland grasslands, <br />filling of these features would require a permit from RWQCB and impacts to these features may be <br />potentially significant. <br />As noted in Impact BIO-2 above, the proposed project will also include the construction of an 18- <br />inch outfall that will drain into the west side of Devaney Creek and a 24-inch outfall that drains into <br />the east side of Devaney Creek near the vicinity of Dublin Canyon Road. Specific design details for <br />the outfalls have not yet been determined. While these outfalls are intended to be above OHWM, <br />they will impact a small amount of riparian habitat in the range of 0.03 to 0.06 acre. The applicant <br />will need to comply with all State and federal regulations related to construction work that will <br />impact aquatic habitats occurring on the site. Under the currently proposed project, the applicant is <br />likely to require a permit from the USACE and RWQCB for the filling of seasonal wetlands in the <br />northern portion of the site. Through compliance with all State and federal regulations, along with <br />implementation of MM BIO-3, which describes avoidance and minimization measure, project <br />impacts to State and federally protected wetlands would be reduced to a less than significant level <br />under CEQA.
The URL can be used to link to this page
Your browser does not support the video tag.