My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Biological Resources Draft EIR <br /> <br /> <br />3.3-42 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-03 Bio Resources.docx <br />Level of Significance Before Mitigation <br />Potentially significant impact. <br />Mitigation Measures <br />MM BIO-3 Mitigation Measures for Aquatic/Wetland Habitats: <br />Minimization <br />To minimize impacts, measures taken during construction activities shall include <br />placing construction silt fencing around preserved aquatic features and riparian <br />areas to ensure that construction activities do not inadvertently impact these areas. <br />As part of project buildout, all proposed lighting shall be designed to avoid light and <br />glare impacts to preserved riparian corridors. Light sources shall not be visible from <br />riparian areas and will not illuminate riparian areas or cause glare on the opposite <br />side of the channels (e.g., to neighboring properties). Additionally, proposed <br />development activities shall be designed and situated to avoid loss of trees within <br />any riparian areas to the maximum extent practicable. Project construction must <br />setback from the Tree Protection Zone (TPZ) of trees within the riparian area. A TPZ <br />is defined as a circle whose center is within the base of an oak tree, the radius of <br />which is equal to an oak tree's height or 10 feet, whichever is greater. <br />Compensation <br />A wetland/riparian Mitigation and Monitoring Plan (MMP) shall be prepared to <br />compensate for a loss of approximately 0.25 acre of seasonal wetlands, 0.06 acre of <br />a Roadside Drainage Ditch, and up to 0.06 acre of the loss of riparian habitat (see <br />Table 3 of Appendix C1). The plan shall identify on-site preservation areas having a <br />sufficient water budget (as determined by a Hydrologist) for the creation of seasonal <br />wetland habitat that is of equal or greater quality to the seasonal wetland habitats <br />being impacted at a minimum 2:1 creation:loss. If sufficient areas for the creation of <br />wetland habitat cannot be identified on the preserve area, then the MMP shall <br />include off-site mitigation, preferably within the same watershed, as an alternative <br />strategy. At a minimum, the MMP shall: <br />• Define the location of all created wetlands. <br />• Provide evidence of a suitable water budget to support any created wetland <br />habitats, as determined by a qualified Hydrologist. <br />• Identify species, size, number, and location of plants to be installed. <br />• Identify time of year for planting and any methods for supplemental watering <br />during the establishment period. <br />• Identify the monitoring period for wetlands of no less than 5 years and no less <br />than 10 years for riparian creation/enhancement. <br />• Identify measures that will be monitored, and define incremental and final <br />success criteria that will be required for the wetland mitigation to be deemed a <br />success.
The URL can be used to link to this page
Your browser does not support the video tag.