Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Biological Resources <br /> <br /> <br />FirstCarbon Solutions 3.3-45 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-03 Bio Resources.docx <br />Mitigation Measures <br />MM BIO-5 Tree Preservation Plan <br />For trees to be retained, a tree preservation plan shall be prepared for the project <br />identifying all protection and mitigation measures to be taken. These measures will <br />remain in place for the duration of construction activities at the project site. <br />The following are recommendations for design and construction phases that will <br />assist in successful tree preservation. <br />Design recommendations <br />a. Locate the trunk of all trees recommended for preservation that are located <br />within 25 feet of the edge of grading and/or utility installation. Include trunk <br />locations and tree tag numbers on all plans. <br />b. Establish a Tree Protection Zone (TPZ) around each tree to be preserved. For <br />design purposes, the TPZ shall be 3 feet behind the edge of grading. No grading, <br />excavation, construction or storage of materials shall occur within that zone. <br />c. Install protection around all trees to be preserved. No entry is permitted into a <br />TPZ without permission of the Project Superintendent. <br />d. Use only herbicides safe for use around trees and labeled for that use, even <br />below pavement. <br /> <br />Pre-construction and demolition treatments and recommendations: <br />1. The demolition contractor shall meet with the Consulting Arborist before <br />beginning work to discuss work procedures and tree protection. <br />2. Trees to be preserved may require pruning to provide adequate clearance from <br />construction activities. All pruning shall be performed by a licensed State of <br />California contractor possessing the C61 classification license and the D49 <br />specification. All pruning shall adhere to the latest editions of the American <br />National Standards Institute Z133 and A300 standards. <br />3. Install tree protective fencing at the edge of the TPZ. No grading, construction, <br />installation or other activity is permitted within this area. <br />4. Stake the edge of grading along the East Bay Regional Park District (EBRPD) <br />access road in order to review impacts to trees. <br /> <br />Tree protection during construction: <br />1. Prior to beginning work, contractors working near trees to be preserved shall be <br />required to meet with the Consulting Arborist at the project site to review all <br />work procedures, access routes, storage areas, and tree protection measures. <br />2. Any grading, construction, demolition or other work that is expected to <br />encounter tree roots shall be monitored by the Consulting Arborist. <br />3. If injury should occur to any tree during construction, it shall be evaluated as <br />soon as possible by the Consulting Arborist so that appropriate treatments can <br />be applied.