My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Geology, Soils, and Seismicity Draft EIR <br /> <br /> <br />3.6-32 FirstCarbon Solutions <br /> https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-06 Geology.docx <br />building plans to reduce the impacts of expansive soils, in accordance with the CBC. The City <br />Engineer would review and approve the plans prior to issuance of a grading or building permit. With <br />MM GEO-1, the proposed project would not create a substantial risk to life or property from being <br />located on expansive soils and impacts related to expansive soils would be less than significant with <br />mitigation incorporated. <br />Level of Significance Before Mitigation <br />Potentially significant impact. <br />Mitigation Measures <br />Implement MM GEO-1. <br />Level of Significance After Mitigation <br />Less than significant impact. <br />Wastewater Disposal Systems <br />Impact GEO-5: The proposed project would not have soils incapable of adequately supporting the <br />use of septic tanks or alternative wastewater disposal systems where sewers are <br />not available for the disposal of wastewater. <br />Impact Analysis <br />The proposed project is located within the City of Pleasanton. Wastewater infrastructure would be <br />installed along the proposed internal roadways throughout the residential portions of the project <br />site consisting of eight-inch sanitary sewer laterals that would directly connect to eight-inch sanitary <br />sewer laterals underneath Dublin Canyon Road to the north. In addition, stormwater infrastructure <br />would consist of storm drains along internal roadways that would transfer stormwater to three on- <br />site bioretention areas for treatment before connecting to the City’s existing storm drainage system. <br />Since the proposed project would connect to already available wastewater and stormwater systems, <br />no septic tanks or alternative wastewater disposal systems would be installed. Therefore, no direct, <br />indirect or cumulative impact related to soil capability of supporting the use of septic tanks or <br />alternative wastewater disposal would occur. <br />Level of Significance <br />No impact. <br />Destruction of Paleontological Resource or Unique Geologic Feature <br />Impact GEO-6: The proposed project would not directly or indirectly destroy a unique <br />paleontological resource or site or unique geologic feature. <br />Impact Analysis <br />Construction activities associated with the project site include ground-disturbing activities such as <br />grading, trenching, and cutting and filling. The project site is located on colluvium and residual soils <br />at the surface with marine sedimentary bedrock of Miocene-age comprised of sandstone, siltstone, <br />and siliceous shale in the subsurface that are associated with the Claremont member of the
The URL can be used to link to this page
Your browser does not support the video tag.