Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Geology, Soils, and Seismicity <br /> <br /> <br />FirstCarbon Solutions 3.6-33 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-06 Geology.docx <br />Monterey Formation (Tm) and an unnamed Miocene siltstone and clay shale (Tmc) formation. In <br />addition, the UCMP Locality Search Online Database and records search conducted on March 25, <br />2025, did not identify any fossil localities within the project boundaries. However, vertebrate and <br />invertebrate fossil localities have been uncovered within both the Claremont Shale member (or <br />Formation) and the Monterey Formation (or Group) (Tm) in proximity to the project site and in the <br />surrounding region. Although surficial deposits on most of the project site consist of colluvium and <br />residual soils ranging from approximately 2-11 feet in depth, which have low paleontological <br />potential, subsurface conditions also consist of high paleontological potential rock units from the <br />Claremont Shale member (or Formation) and the Monterey Formation (Group) that have been <br />associated with vertebrate and invertebrate localities in the geographic region. As such, excavations <br />that intrude into the Claremont shale and Monterey formations (i.e., generally below 2 feet) during <br />construction of the proposed project may directly or indirectly destroy a unique paleontological <br />resource. This would constitute a significant adverse impact on paleontological resources. <br />Thus, implementation of MM GEO-2a through GEO-2d would include the provisions required for the <br />protection and recovery of paleontological resources. As such, with the implementation of MM GEO- <br />2a through GEO-2d, impacts related to damaging unique paleontological resources would be <br />reduced to less than significant. <br />Operation <br />Potential impacts to paleontological resources are limited to the construction phase. No operational <br />impacts are anticipated. <br />Level of Significance Before Mitigation <br />Potentially significant impact. <br />Mitigation Measures <br />MM GEO-2a Prior to the issuance of grading permits, the project proponent/developer shall <br />demonstrate the retention of the services of a qualified professional Paleontologist <br />as defined by the Society of Vertebrate Paleontology (SVP). The qualified <br />Paleontologist shall prepare a Paleontological Resource Impact Mitigation <br />Monitoring Program (PRIMMP). The project proponent/developer shall submit the <br />PRIMMP to and receive approval from the City/Lead Agency. The PRIMMP will <br />describe, in addition to industry standards and SVP standards, the level of <br />monitoring required in the project area, qualifications of the Paleontological monitor <br />for grading operations, and identification of personnel with authority and <br />responsibility to temporarily halt or divert grading equipment to allow for recovery <br />of large specimens. Furthermore, the PRIMMP shall provide direction for any fossil <br />discoveries to be immediately reported, means and methods to be employed to <br />quickly salvage fossils as they are unearthed to avoid construction delays, sampling <br />procedures and protocol for collecting and processing sediments and specimens, <br />fossil identification, and reporting and curation procedures to be employed. The <br />report will include the paleontological records search conducted at the UCMP, <br />pertinent exhibits, maps and reference procedures for reporting of findings.