Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Greenhouse Gas Emissions Draft EIR <br /> <br /> <br />3.7-10 FirstCarbon Solutions <br /> https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-07 GHG.docx <br />CalEEMod (off-model), accounting for the nature of each type of demolition and material density. It <br />was then converted to tons and entered into CalEEMod this way. Details of these additional <br />calculations are included along with the CalEEMod report in Appendix B. <br />Site Preparation and Grading <br />Hauling would be required to export material to/from the project site; according to applicant- <br />provided information, the site will be balanced and will result in no additional daily haul trips during <br />the site preparation phase. <br />Building Construction <br />During building construction activities, on-site emissions are primarily generated from the off-road <br />construction equipment and are calculated using the equipment specified along with the ARB Off- <br />Road Emission and Load Factors, the number of construction days and hours of operation per day. <br />Off-Site Construction Vehicles <br />A summary of the construction-related vehicle trips is shown in Appendix B. Note that the total <br />number of construction vehicle trips would not necessarily occur on the same day because <br />construction activities would vary each day during the construction period. <br />Off-road emissions for demolition, site preparation, and grading phases are based on construction <br />worker and haul trips both calculated internally in CalEEMod based on the number of pieces of off- <br />road construction equipment for workers and the amount of demolition materials for hauling, <br />assuming a 16 cubic yard capacity truck. Vendor trips may be optionally added for each phase as <br />appropriate to the project and were added to the site preparation phase to account for the off haul <br />of soil export and in the paving phase to account for delivery of asphalt and any aggregate base <br />material needed for paving. Default hauling trips are 20 miles; Vendor trips are 8.4 miles and worker <br />commute trip lengths are 11.7 miles based on the site location. <br />Trips for building construction and architectural coating activities are based on the square footage of <br />the buildings and the number of dwelling units for residential land uses. <br />Mitigation Measures <br />Emissions modeling was performed for an unmitigated scenario for this project. <br />Operation <br />To assess operational-related GHG emissions and their potential to cause a significant impact, the <br />proposed project is analyzed for its consistency with the City’s CAP 2.0. This is discussed in greater <br />detail in the analysis section below. <br />3.7.6 - Thresholds of Significance <br />The BAAQMD’s 2022 CEQA Air Quality Guidelines provide recommended significance thresholds for <br />GHGs for land use development projects and plans. The new thresholds state that, if a project would <br />contribute its “fair share” of what will be required to achieve California’s long-term climate goal of <br />carbon neutrality by 2045, then a reviewing agency can find that the impact will not be significant <br />because the project will help to solve the problem of global climate change. The thresholds for new