My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-23 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />site compensation shall be completed. The <br />mitigation plan shall provide for a minimum <br />of a 1:1 replacement ratio of suitable <br />habitat. It shall define the location and <br />whether this mitigation is on or off-site, <br />measures to restore and/or enhance existing <br />habitat, management strategies to maintain <br />the conservation value of the habitat into <br />perpetuity, and a funding source for the <br />ongoing management. <br />Compensation may necessitate the need to <br />obtain an Incidental Take Permit from CDFW <br />under the California Endangered Species Act <br />(CESA). If in the end, the Fish and Game <br />Commission chooses to not list the Crotch’s <br />bumble bee under CESA, then this would <br />vacate the need to implement the <br />minimization and avoidance methods above. <br />MM BIO-1g: Mitigation Measure for San <br />Francisco Dusky-Footed Woodrats <br />Avoidance and Minimization <br />A qualified Biologist shall conduct a pre- <br />construction survey for San Francisco dusky- <br />footed woodrat nests no more than 30 days <br />and no less than 14 days prior to the onset <br />of construction activities in or within 50 feet <br />of riparian habitat. This survey timing allows <br />for the scheduling of and deconstruction of <br />any woodrat nests which need relocating. <br />The survey shall encompass all construction <br />zones and surrounding lands within 50 feet. <br />If no woodrat nests are present, no <br />additional measures are required.
The URL can be used to link to this page
Your browser does not support the video tag.