My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-24 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />A report shall be prepared for submission to <br />the City summarizing the results of the <br />survey which identifies any buffer zones and <br />outlines recommended next steps, including <br />measures implemented to prevent impacts <br />to San Francisco dusky-footed woodrats. <br />Nest deconstruction <br />Identified nests shall be avoided, where <br />possible. If avoidance is not possible, as <br />determined by a qualified Biologist in <br />coordination with the applicant, the nest(s) <br />will be manually deconstructed by a <br />qualified Biologist when helpless young are <br />not present, typically during the <br />nonbreeding season (October through <br />January). The nest will be reconstructed in a <br />nearby suitable area. <br />Construction-free buffers <br />If it is determined during the pre- <br />construction survey that young may be <br />present, a suitable buffer, delineated with <br />flagging, depending on the timing within the <br />breeding season (ranging from 15–50 feet) <br />will be established around the nest by the <br />qualified Biologist and maintained during <br />construction until the young are <br />independent and have successfully moved <br />from the nest on their own. <br />MM BIO-1h: Mitigation Measure for <br />Ringtails <br />Pre-construction Survey <br />A qualified Biologist shall conduct pre- <br />construction surveys for the ringtail prior to <br />any disturbance to the property. All suitable
The URL can be used to link to this page
Your browser does not support the video tag.