My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-25 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />areas within the project site shall be <br />surveyed with walking transects within 2 <br />days prior to the onset of construction. This <br />survey can be conducted in conjunction with <br />other pre-construction surveys. <br />Tailgate Training <br />All workers on the project and access <br />corridor shall attend a tailgate training that <br />includes a description of the species, <br />summary of its biology, and minimization <br />measures and instructions on what to do if a <br />ringtail is observed. <br />Protective Measures for Individuals <br />In the event an individual is discovered <br />within a construction zone on-site, <br />construction would be halted until the <br />individual self-relocates from the project <br />site. A ringtail would not be expected to be <br />residing within the area of development; <br />therefore, self-relocation is believed to be <br />inevitable. Once the Biologist has <br />determined that the animal has moved <br />outside of potential danger, construction <br />activities could resume. If the ringtail is <br />found to be residing within a construction <br />zone on-site, an appropriate construction- <br />free buffer (to be determined by a qualified <br />Biologist) would be established around the <br />area being used by the ringtail until the nest <br />is abandoned by adult(s) and young for the <br />year (approximately after September). <br />MM BIO-1i: Avoidance and Minimization <br />Measures for Burrowing Owls
The URL can be used to link to this page
Your browser does not support the video tag.