Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-28 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />Impact BIO-3: The proposed project would not <br />have a substantial adverse effect on State or <br />federally protected wetlands (including, but not <br />limited to, marsh, vernal pool, coastal, etc.) <br />through direct removal, filling, hydrological <br />interruption, or other means. <br />Potentially significant impact. MM BIO-3: Mitigation Measure for <br />Aquatic/Wetland Habitats <br />Minimization <br />To minimize impacts, measures taken during <br />construction activities shall include placing <br />construction silt fencing around preserved <br />aquatic features and riparian areas to ensure <br />that construction activities do not <br />inadvertently impact these areas. <br />As part of project buildout, all proposed <br />lighting shall be designed to avoid light and <br />glare impacts to preserved riparian <br />corridors. Light sources shall not be visible <br />from riparian areas and will not illuminate <br />riparian areas or cause glare on the opposite <br />side of the channels (e.g., to neighboring <br />properties). Additionally, proposed <br />development activities shall be designed and <br />situated to avoid loss of trees within any <br />riparian areas to the maximum extent <br />practicable. Project construction must <br />setback from the Tree Protection Zone (TPZ) <br />of trees within the riparian area. A TPZ is <br />defined as a circle whose center is within the <br />base of an oak tree, the radius of which is <br />equal to an oak tree's height or 10 feet, <br />whichever is greater. <br />Compensation <br />A wetland/riparian Mitigation and <br />Monitoring Plan (MMP) shall be prepared to <br />compensate for a loss of approximately 0.25 <br />acre of seasonal wetlands, 0.06 acre of a <br />Roadside Drainage Ditch, and up to 0.06 <br />acre of the loss of riparian habitat (see Table <br />Less than significant impact with <br />mitigation incorporated.