My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-29 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />3 of Appendix C1). The plan shall identify on- <br />site preservation areas having a sufficient <br />water budget (as determined by a <br />Hydrologist) for the creation of seasonal <br />wetland habitat that is of equal or greater <br />quality to the seasonal wetland habitats <br />being impacted at a minimum 2:1 <br />creation:loss. If sufficient areas for the <br />creation of wetland habitat cannot be <br />identified on the preserve area, then the <br />MMP shall include off-site mitigation, <br />preferably within the same watershed, as an <br />alternative strategy. At a minimum, the <br />MMP shall: <br />• Define the location of all created <br />wetlands. <br />• Provide evidence of a suitable water <br />budget to support any created wetland <br />habitats, as determined by a qualified <br />Hydrologist. <br />• Identify species, size, number, and <br />location of plants to be installed. <br />• Identify time of year for planting and any <br />methods for supplemental watering <br />during the establishment period. <br />• Identify the monitoring period for <br />wetlands of no less than 5 years and no <br />less than 10 years for riparian <br />creation/enhancement. <br />• Identify measures that will be monitored, <br />and define incremental and final success <br />criteria that will be required for the <br />wetland mitigation to be deemed a <br />success.
The URL can be used to link to this page
Your browser does not support the video tag.