Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-30 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />• Identify adaptive management <br />procedures that accommodate <br />uncertainty that comes with wetland <br />creation projects. These include (but are <br />not limited to) measures to address <br />colonization by invasive species, <br />unexpected lack of water, excessive <br />foraging of installed wetland plants by <br />wildlife, etc. <br />• Define management and maintenance <br />activities (weeding, repair of water <br />delivery systems and browsing protection, <br />etc.). <br />• Provide for surety in funding for MMP and <br />for in perpetuity preservation and <br />management of created wetland habitats. <br />Impact BIO-4: The proposed project would not <br />interfere substantially with the movement of any <br />native resident or migratory fish or wildlife species <br />or with established native resident or migratory <br />wildlife corridors, or impede the use of wildlife <br />nursery sites. <br />Less than significant impact. None. Less than significant impact. <br />Impact BIO-5: The proposed project would not <br />conflict with any local policies or ordinances <br />protecting biological resources, such as a tree <br />preservation policy or ordinance. <br />Potentially significant impact. MM BIO-5: Tree Preservation Plan <br />For trees to be retained, a tree preservation <br />plan shall be prepared for the project <br />identifying all protection and mitigation <br />measures to be taken. These measures <br />should remain in place for the duration of <br />construction activities at the project site. <br />The following are recommendations for <br />design and construction phases that will <br />assist in successful tree preservation. <br />Less than significant impact with <br />mitigation incorporated.