My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Introduction <br /> <br /> <br />FirstCarbon Solutions 1-1 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec01-00 Introduction.docx <br />CHAPTER 1: INTRODUCTION <br />1.1 - Overview of the CEQA Process <br />This Draft Environmental Impact Report (Draft EIR) is prepared in accordance with the California <br />Environmental Quality Act (CEQA) to evaluate the potential environmental impacts associated with <br />the implementation of the proposed Hidden Canyon Residences and Preserve (proposed project) <br />(State Clearinghouse [SCH] No. 2019080461). This document is prepared in conformance with CEQA <br />(California Public Resources Code [PRC], § 21000, et seq.) and the CEQA Guidelines (California Code <br />of Regulations [CCR], Title 14, § 15000, et seq.). This Draft EIR is intended to serve as an <br />informational document for the public agency decision-makers and the public regarding the <br />proposed project. <br />1.1.1 - Overview <br />The proposed project is located on a 130-acre site within unincorporated Alameda County, with a <br />portion of the site located within the City of Pleasanton Urban Growth Boundary (UGB). The portion <br />of the project site within the UGB would be annexed into the City and rezoned to facilitate the <br />development of 28 detached single-family residential units and private open space, and <br />redevelopment of two existing single-family homes and private open space on the eastern portion of <br />the project site. Additionally, the existing Oak Hills Congregation Site (APN 941-2700-1) would be <br />annexed into the City, but would continue to operate under existing conditions. Finally, the <br />remaining 58.3 acres of the project site, to the west of the City’s UGB, would remain in <br />unincorporated Alameda County, but would be dedicated to the East Bay Regional Parks District <br />(EBRPD) as public open space. Chapter 2, Project Description provides a complete description of the <br />proposed project. <br />1.1.2 - Purpose and Authority <br />This Draft EIR provides a project-level analysis of the environmental effects of the proposed project. The <br />environmental impacts of the proposed project are analyzed in the Draft EIR to the degree of specificity <br />appropriate, in accordance with CEQA Guidelines Section 15146. This document addresses the <br />potentially significant adverse environmental impacts that may be associated with the planning, <br />construction, or operation of the proposed project. It also identifies appropriate and feasible mitigation <br />measures and alternatives that may be adopted to significantly reduce or avoid these impacts. <br />CEQA requires that an EIR contain, at a minimum, certain specific elements. These elements are <br />contained in this Draft EIR and include: <br />• Table of Contents <br />• Introduction <br />• Executive Summary <br />• Project Description <br />• Environmental Setting, Significant Environmental Impacts, and Mitigation Measures <br />• Cumulative Impacts
The URL can be used to link to this page
Your browser does not support the video tag.