Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Introduction Draft EIR <br /> <br /> <br />1-2 FirstCarbon Solutions <br /> https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec01-00 Introduction.docx <br />• Significant Unavoidable Adverse Impacts <br />• Alternatives to the Proposed Project <br />• Growth-Inducing Impacts <br />• Effects Found not to be Significant <br />• Areas of Known Controversy <br /> <br />1.1.3 - Lead Agency Determination <br />The City of Pleasanton is designated as the Lead Agency for the proposed project. CEQA Guidelines <br />Section 15367 defines a lead agency as “. . . the public agency, which has the principal responsibility <br />for carrying out or approving a project.” Other public agencies may use this Draft EIR in the decision- <br />making or permit process and consider the information in this Draft EIR along with other information <br />that may be presented during the CEQA process. <br />This Draft EIR was prepared by FirstCarbon Solutions (FCS), an environmental consultant. Prior to <br />public review, it was extensively reviewed and evaluated by the City of Pleasanton. This Draft EIR <br />reflects the independent judgment and analysis of the City of Pleasanton as required by CEQA. Lists <br />of organizations and persons consulted and the report preparation personnel is provided in Chapter <br />7 of this Draft EIR. <br />1.2 - Scope of the Draft EIR <br />This Draft EIR addresses the potential environmental effects of the proposed project. The City of <br />Pleasanton issued a Notice of Preparation (NOP) for the proposed project on August 22, 2019, which <br />circulated between August 22, 2019, and September 23, 2019, for the statutory 30-day public review <br />period. The scope of this Draft EIR includes the potential environmental impacts identified in the <br />NOP and issues raised by agencies and the public in response to the NOP. The NOP is contained in <br />Appendix A of this Draft EIR. <br />Eight comment letters were received in response to the NOP and additional comments were made at <br />the Public Scoping Meeting held on September 11, 2019 at the City Council Chambers. Comments <br />are listed in Table 1-1 and provided in Appendix A of this Draft EIR. <br />Table 1-1: NOP Comment Letters <br />Agency/ <br />Organization Author Date <br />Topics Discussed in <br />Comment Letter <br />Location Comment is <br />Addressed/Discussed in <br />Draft EIR <br />Public Agencies <br />Native American <br />Heritage <br />Commission <br />(NAHC) <br />Andrew Green September 10, <br />2019 <br />Summarizes CEQA <br />requirements and <br />background information. <br />N/A <br />Summarizes Assembly Bill <br />(AB) 52 and Senate Bill <br />(SB) 18 requirements for <br />Section 3.4, Cultural <br />Resources and Tribal <br />Cultural Resources