My WebLink
|
Help
|
About
|
Sign Out
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:56:02 PM
Creation date
12/2/2025 3:55:25 PM
Metadata
Fields
Template:
CITY CLERK
Text box
ID:
1
Creator:
PLAN1
Created:
12/2/2025 3:56 PM
Modified:
12/2/2025 3:56 PM
Text:
http://www.cityofpleasantonca.gov/gov/depts/os/env/energy_and_sustainability.asp
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Revised June 2023 Page 4 of 10 <br />Energy <br />Energy Efficiency <br />CAP 2.0 <br />(S2) <br />Additions and <br />Renovations <br />6.Energy Efficiency Upgrades. Will the Project install <br />energy efficient window upgrades, LED lighting, and <br />other efficiency upgrades. Rebates and financing may be <br />available. Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Renewable Energy <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />7.Solar. Will the Project include installation of a solar PV <br />system at time of new construction that meets the power <br />needs of the new building? Indicate the plan sheet(s) <br />where solar information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />8.Energy Storage System. When solar is being <br />installed, will the Project include a battery storage back- <br />up system? Indicate the plan sheet(s) where battery <br />storage information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />CAP 2.0 <br />(P4) All Projects <br />9.Water Heater. If a new water heater is being installed, <br />will the Project include installation of a solar water <br />heater? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />X <br />The project will comply with the <br />requirement to include a battery storage <br />back-up system when solar is being <br />installed. The applicant has indicated <br />adherence to both the current 2022 <br />UBC and the anticipated 2025 UBC, <br />which includes provisions for energy <br />storage systems <br />The project will comply with the <br />requirement to include a solar PV system <br />that meets the power needs of the new <br />building at the time of construction. The <br />applicant has indicated adherence to both <br />the current 2022 UBC and the anticipated <br />2025 UBC, which includes provisions for <br />solar energy systems <br />X <br />X <br />X <br />Appendix B 58
The URL can be used to link to this page
Your browser does not support the video tag.