My WebLink
|
Help
|
About
|
Sign Out
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:56:02 PM
Creation date
12/2/2025 3:55:25 PM
Metadata
Fields
Template:
CITY CLERK
Text box
ID:
1
Creator:
PLAN1
Created:
12/2/2025 3:56 PM
Modified:
12/2/2025 3:56 PM
Text:
https://www.bayren.org/rebates-financing/single-family-homeowners
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Revised June 2023 Page 5 of 10 <br />Building Electrification <br />CALGreen <br />Code <br />New <br />Construction <br />10.All-Electric. Will the Project be all-electric (i.e., does <br />not include any new gas infrastructure), including <br />lighting, heating, cooking, and water heating?2 <br />Yes☐ <br />No☐ <br />N/A☐ <br />CAP 2.0 <br />(P2) <br />Additions and <br />Renovations <br />11.All-Electric Existing Buildings. Will the Project <br />upgrade existing residential and commercial buildings to <br />be all-electric (e.g., air source heat pumps, heat pump <br />water heaters, electric dryers, and induction stoves)? <br />Rebates may be available. Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(S1) All Projects <br />12.Refrigerant Management. If new heating, <br />ventilation, and air conditioning (HVAC) systems are <br />being installed, does the project incorporate the lowest <br />global warming potential (GWP) refrigerants for HVAC <br />systems? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />2 The Building Code includes limited exceptions including to commercial kitchens with a business-related need to cook with combustion equipment; industrial processes for labs, research, or educational related <br />needs; and/or if the applicant establishes that there is not an all-electric prescriptive compliance pathway for the building under the California Building Energy Efficiency Standards and that the building is not able to <br />achieve the performance compliance standard applicable to the building under the Energy Efficiency Standards. <br />X <br />X <br />X The project will be all-electric, with no new gas <br />infrastructure included. This encompasses all <br />aspects such as lighting, heating, cooking, and <br />water heating. The applicant has indicated <br />adherence to both the current 2022 UBC and the <br />anticipated 2025 UBC, which support this all-electric <br />approach. <br />Appendix B 59
The URL can be used to link to this page
Your browser does not support the video tag.