Laserfiche WebLink
<br /> <br />8 <br />exceeds the typical suburban average and contributes positively to the street network’s <br />connectivity. <br /> <br />4. Strategy 4B – Pedestrian Facility Improvement – As part of project frontage improvements, <br />the Hidden Canyon Residences & Preserve development will construct approximately 0.2 miles <br />of continuous sidewalk along its public access frontage. <br /> <br />5. Strategy 4C – Bikeway Network Expansion - This strategy is partially applicable. Class II bike <br />lanes currently exist along Dublin Canyon Road and further expansions are not feasible due to <br />the terrain. The project may coordinate with the City of Pleasanton to explore opportunities <br />for off-site bikeway enhancements or connections to regional bicycle routes. Implementation <br />would likely occur off-site and require City partnership or inclusion in future capital <br />improvement planning. <br /> <br />6. Strategy 4H – Provide Neighborhood Traffic Calming Measures - Given the steep terrain, <br />it is recommended to implementing traffic calming measures along internal roads and <br />intersections within the site to enhance safety. The inclusion of traffic calming features such as <br />speed humps, curb extensions, or lane narrowing etc. can help reduce vehicle speeds, <br />encourage active transportation, and contribute to VMT reductions. <br />Collectively, these measures are estimated to achieve a combined VMT reduction of 14%. <br />The City of Pleasanton’s 2023–2031 Housing Element EIR identified a range of mitigation strategies <br />aimed at reducing Vehicle Miles Traveled (VMT), including pedestrian facility improvements, street <br />connectivity enhancements, bicycle infrastructure, and traffic calming. The Hidden Canyon Residences <br />& Preserve project includes multiple feasible strategies consistent with the EIR’s recommendations, <br />including the installation of sidewalks along the public access frontage, provision of internal <br />intersections to improve connectivity, and incorporation of neighborhood traffic calming features. <br />These measures reflect the types of VMT-reducing features considered in the Housing Element EIR and <br />are consistent with its mitigation framework. Therefore, the project meets the mitigation requirements <br />outlined in the Housing Element EIR. However, as was already acknowledged in the Housing Element <br />EIR, implementation of these measures does not reduce VMT below the CEQA significance threshold. <br />As a result, the project would result in a significant and unavoidable VMT impact, consistent with <br />the conclusions of the certified Housing Element EIR. <br />