Laserfiche WebLink
<br />2 <br /> <br />Addendum to the Housing Element FEIR for the proposed <br />Additional Housing Opportunity Zone Sites <br />City of Pleasanton <br />intent of the kick-off meeting is to clarify and confirm the details of the Scope and schedule, confirm details of <br />the project and other relevant information, and identify key points of contact. FCS will review relevant <br />background documents to ensure project understanding. FCS’s technical staff will attend this meeting to clarify <br />data needs. FCS will also provide a Request for Information (RFI), which will detail additional information <br />needed to complete the CEQA analyses. Site visits will be conducted as part of the project initiation process to <br />document existing conditions. <br />Task 2: Comprehensive Project Description <br />Using the information obtained during project initiation, FCS will prepare a comprehensive Project Description <br />for City review and approval. Pursuant to CEQA Guidelines Section 15124, the Project Description will identify <br />the project location, describe the project characteristics, identify necessary approvals, and list other agencies <br />that may use the document for environmental review. The Project Description will use graphics and tables to <br />clearly convey relevant information to the reviewer and will include all of the information required to define the <br />proposed project for the purposes of CEQA, including a clear explanation of the development components of <br />the proposed project, a description of the construction and operational activities associated with the proposed <br />project, and clearly illustrated project components displayed in exhibits based on Geographic Information <br />System data. <br />The approved Project Description will form the basis for evaluating the proposed project in the CEQA <br />document. The draft Project Description will be submitted to the City for review and approval prior to the <br />development of the Administrative Draft CEQA document. It is assumed that the City will coordinate internally <br />and provide one set of consolidated, vetted comments (with tracked changes in the Microsoft Word document) <br />on the draft Project Description and a complete RFI to FCS within two weeks of submittal. Changes to the <br />Project Description made after the City has issued their approval may require a Change Order and may extend <br />the project schedule. <br />DELIVERABLE: <br /> Electronic copy (via email in Microsoft Word format) of the Project Description to the City. <br />Task 3: Technical Analyses <br />Subtask 3.1: Air Quality Assessment, Greenhouse Gas Emissions, and Energy <br />Assessment, and Health Risk Assessment <br />FCS will prepare an Air Quality, Greenhouse Gas (GHG) Emissions, and Energy Analysis to evaluate project- <br />related construction and operational activities and will provide a comparative analysis to impacts identified in <br />the Housing Element FEIR. The analysis will be wholly contained in the appropriate section of the Addendum, <br />with any relevant supporting technical data appended to the document. <br />In addition, the analyses will address applicable mitigation measures from the Housing Element FEIR that will <br />apply to the proposed project as existing mitigation measures. <br />Docusign Envelope ID: 28703CF9-39C1-4CC6-9C23-4E16152059FDDocusign Envelope ID: 276BF274-B283-45D5-94A5-B39D73173D41