My WebLink
|
Help
|
About
|
Sign Out
FIRST CARBON SOLUTIONS (#2026339)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
F
>
FIRST CARBON SOLUTIONS (#2026339)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 4:25:59 PM
Creation date
12/11/2025 4:23:52 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
FIRST CARBON SOLUTIONS
Contract Record Series
704-05
Munis Contract #
2026339
Contract Expiration
12/31/2026
NOTES
ENVIRONMENTAL IMPACT REPORTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9 <br /> <br />Addendum to the Housing Element FEIR for the proposed <br />Additional Housing Opportunity Zone Sites <br />City of Pleasanton <br />Newspaper Noticing/Local Noticing <br />This Scope assumes that City staff will coordinate publication of any newspaper and online notices, if needed. <br />Schedule <br />FCS has prepared the following schedule outlining the anticipated timing of each task. <br />Task Week <br />Task 1 Project Initiation and Kick-off Meeting 1 <br />Task 2 Comprehensive Project Description 3 <br />Task 3 Technical Analyses <br />Subtask 3.1 Air Quality Assessment, GHG Emissions, and Energy <br />Assessment1 9 <br />Subtask 3.2 Biological Resources Analysis 6 <br />Subtask 3.3 Cultural Resources Analysis 8 <br />Subtask 3.4 Noise Impact Analysis2 9 <br />Task 4 Administrative Draft Addendum 11 <br />– City review of Administrative Draft Addendum 13 <br />Tasks 5 and 7 Screencheck Draft Addendum3 and Draft MMRP 16 <br />– City review of Screencheck Draft Addendum and Draft MMRP 17 <br />Tasks 6 and 7 Final Addendum3 and NOD and Final MMRP 18 <br />Task 8 Public Hearing Attendance (Optional) To Be Determined <br />Task 9 Project Management, Coordination, and Project Meetings Ongoing <br />Notes: <br />1 Assumes the project trip generation forecast and intersection traffic volumes are complete within four weeks of project initiation. Air <br />quality analysis will be conducted six weeks after receipt of the project trip generation forecast and intersection traffic volumes, <br />responses to the RFI, and an approved Project Description, whichever is latest. <br />2 Noise analysis will be conducted six weeks after receipt of the Transportation Analysis, responses to the RFI, and a City-approved <br />Project Description, whichever is latest. <br />3 Schedule dependent on volume and complexity of City comments. Estimate assumes no substantial comments or reanalysis. <br /> Budget <br />FCS has prepared the following budget identifying the costs of each task. <br />Docusign Envelope ID: 28703CF9-39C1-4CC6-9C23-4E16152059FDDocusign Envelope ID: 276BF274-B283-45D5-94A5-B39D73173D41
The URL can be used to link to this page
Your browser does not support the video tag.