Page 3 of 4 <br />Phase 1 is anticipated to be bid in mid-2026, with construction beginning in the fall of 2026. <br /> <br />The design of Phase 2 of the project is anticipated to take nine months to complete. This <br />timeline could allow both Phase 1 and Phase 2 to be bid simultaneously in the fall of 2026. <br />Bidding and completing both phases simultaneously should result in some construction cost <br />savings. <br /> <br />Consultant Services <br />Mark Thomas completed the 95 percent plans for Phase 1 in June 2025 and is preparing the <br />necessary documents for environmental clearance (California Environmental Quality Act <br />(CEQA) and National Environmental Policy Act (NEPA)). The consultant is also in the process <br />of obtaining the required Caltrans Authorization for Construction and temporary construction <br />easements. <br /> <br />Phase 2 of the project will not require NEPA clearance or Caltrans review, resulting in a faster <br />design completion compared to Phase 1. The City is satisfied with Mark Thomas’s work on the <br />project, and staff recommends amending the existing contract to include the Phase 2 design. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this project will advance the Climate Action Plan (CAP 2.0) in Transportation and <br />Land Use by promoting an effective transportation system and enhancing bike and pedestrian <br />access for the community through the development of a multi-modal corridor. <br /> <br />OUTREACH <br />The concept plan was presented to the Bike, Pedestrian and Trails Committee, Parks and <br />Recreation Commission, and Hacienda Business Park’s residents/owners in the summer of <br />2023. Information on the West Las Positas Multimodal Reconstruction Project is also posted <br />on the City’s website. Staff will be developing an extensive outreach program to collaborate <br />with adjacent property owners, anticipate and manage construction impacts, and maintain <br />access to adjacent properties. Both the grant funding application and award were reviewed by <br />the Bicycle, Pedestrian, and Trails Committee and the City Council. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton strategic plan goal of Investing <br />in Our Environment, Strategy 1—Implement the four-year Capital Improvement Program (CIP) <br />to complete the design and construction of budgeted capital projects, and the strategy to <br />continue to invest in parks, bicycle and pedestrian infrastructure, and public art. This action will <br />improve traffic safety and the level of comfort for cyclists and pedestrians commuting to school. <br /> <br />FISCAL IMPACT <br />Funding for the scope of work covered under this Fourth Amendment to the contract with Mark <br />Thomas is budgeted and available in the fiscal year 2025/2026 CIP budget, under CIP No. <br />26514, West Las Positas Boulevard Multimodal Reconstruction - Owens Drive to Santa Rita <br />Road. The funding for this CIP includes a $750,000 grant from ACTC, which requires a <br />$250,000 local match. This local match is provided by the direct local distribution of Measure <br />BB pedestrian and bicycle funds, and would augment the grant to cover the full cost of the <br />proposed contract amendment. <br /> <br />Docusign Envelope ID: 13052E52-7AE9-4FA9-885F-4547DF464456