My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Dan Yoon 5150.100.001 <br />Hana Japan Steak House January 23, 2023 <br />2022 CBC SEISMIC DESIGN PARAMETERS UPDATE Latest Revision November 3, 2023 <br /> Page 3 <br /> <br />H is the design height of the wall (in feet) and ΔP is the active incremental seismic force in pounds <br />per horizontal foot of the wall. This force has a horizontal direction and should be applied at <br />0.3 x H from the base of the wall. Since seismic loading requires soil movement, the evaluation <br />of the seismic case should consist of adding the seismic increment to the active soil pressure for <br />all wall types. If retaining walls greater than 6 feet in height are planned with sloping backfill <br />conditions, we can provide active incremental seismic forces upon request. <br /> <br />We are not recommending designing the retaining walls to retain any debris from the slope above. <br />Should any debris be mobilized, this debris would flow over the walls into the parking/drive area <br />and maintenance would be required to clean it up should this occur. The note about <br />Cross-Section A-A is acknowledged. The intent of this cross section is to schematically <br />demonstrate the recommended setback from the property line in our fault study and was not <br />intended to reflect final design conditions that were developed after our report was published. <br /> <br />If you have any questions or comments regarding this letter, please call and we will be glad to <br />discuss them with you. <br /> <br />Sincerely, <br /> <br />ENGEO Incorporated <br /> <br /> <br /> <br /> <br />Jeff Fippin, GE Uri Eliahu, GE <br /> <br />jf/ue/ca
The URL can be used to link to this page
Your browser does not support the video tag.