My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGEO <br /> INCORPORATED <br /> <br /> <br />5150.100.101 <br />May 2, 2008 Page 18 <br />4. Place approximately 4 inches of washed crushed rock bedding along the trench bottom. <br />Washed crushed rock should have 100 percent passing the ¾-inch sieve and less than <br />5 percent passing the No. 4 sieve. <br /> <br />5. Place a minimum 4-inch-diameter slotted or perforated pipe over the initial bedding layer. <br />Orient slots/perforations towards the bottom of the trench. Slope the pipe at least 1 percent <br />towards the collector system. <br /> <br />6. Fill the remaining trench with washed crushed rock to approximately ½ foot below finished <br />grade. <br /> <br />7. In structural areas, compact all crushed rock using 2 to 3 passes of a vibratory plate <br />compactor for each 12-inch loose lift. <br /> <br />8. Fold the filter fabric over the last lift of crushed rock and overlap at least 12 inches. <br /> <br />9. Cover the drainage system with ½ foot of native fill, compacted in accordance with Section <br />4.4. <br /> <br />10. Remove collected water down gradient by connecting the subdrain pipes to storm drains or <br />another suitable collector system. <br /> <br />7. FOUNDATION RECOMMENDATIONS <br /> <br />We developed structural improvement recommendations using data obtained from our field <br />exploration, laboratory test results, and engineering analysis. <br /> <br />7.1 CONVENTIONAL FOOTINGS WITH SLAB-ON-GRADE <br /> <br />The proposed restaurant can be supported on continuous or isolated spread footings bearing in <br />competent native soil or compacted fill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.