My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Peer Review of Geotechnical and Geologic Hazard Investigations BSK Project G2300051 <br />11991 Dublin Canyon Road (Hana Japan) September 6, 2024 <br />Pleasanton, California Page 6 <br /> <br /> <br />pavement subgrade meet a specific R-Value. Therefore, consideration should be given to <br />increasing the depth of the pavement subgrade associated with the minimum recommended R- <br />Value to 24 inches. <br />26. Geotechnical Report, Section 10.2 (Rigid Pavements): Only 4 inches of aggregate base is <br />recommended below the Portland Cement Concrete (PCC) pavement section. A minimum of 6 <br />inches of aggregate base is typically recommended below PCC pavements. Therefore, <br />consideration should be given to increasing the recommended aggregate base layer thickness. <br />27. Geotechnical Report, Section 10.4 (Cut-Off Curbs): The cut-off curbs recommended in this section <br />of the Geotechnical report should not be optional. In particular because the surrounding areas <br />are sloped to drain towards this Site. Prolonged exposure of pavement subgrade to excessive <br />moisture can reduce the pavement life by 50 percent or more. <br />28. Geotechnical Report, Section 12 (Limitations): Reference should be changed to Section 3 for the <br />project description. <br />29. General Comment: The City should require the project Owner to retain ENGEO (the <br />Geotechnical Engineer-of-Record for this project) to review the geotechnical/earthwork aspects <br />of the project plans and specifications before they are finalized and issued for construction. The <br />purpose of this review would be to allow ENGEO to confirm that the recommendations presented <br />in the geotechnical report issued for the Site have been properly incorporated into these <br />documents. The City should also require the project Owner to retain ENGEO during construction <br />of the planned improvements to provide earthwork observation and testing services, including <br />regular visits by a California Certified Engineering Geologist . We believe this approach is <br />essential to the successful construction of this project. <br />Limitations <br />BSK has prepared this peer review letter for the exclusive use of the Client and members of the project <br />design team. Our review has been limited to the review of the document(s) referenced in this letter. The <br />intent of this letter is not to provide engineering recommendations for this project. Our input is provided <br />for the sole purpose of consideration by the City and the design team. We did not perform any additional <br />subsurface exploration, laboratory testing, or engineering analyses as part of our services. Our peer review <br />specifically excludes assessment of environmental characteristics particularly those involving hazardous <br />substances. <br />Our review did not include checking the referenced documents for conformance with State or local <br />government codes. Our professional opinions and conclusions are made in accordance with generally <br />accepted engineering geologic and geotechnical engineering principles and practices that exist currently <br />in the San Francisco Bay Area. No warranties either express or implied, are made as to the professional <br />advice provided under the terms of BSK’s agreement with the Client and included in this report. By <br />performing the peer review services described in this letter, BSK does not assume the role of Geotechnical <br />Engineer-of-Record for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.