Laserfiche WebLink
<br />Hana Japan Steak House 5150.100.001 <br />11991 Dublin Canyon Road November 11, 2024 <br />RESPONSE TO COMMENTS Page 4 <br /> <br />Comment 10 Geotechnical Report, Section 5.4.3 (2007 CBC Seismic Design Parameters): <br />We understand these parameters have been superseded by the those provided in the CBC update <br />Letter. However, please refer to Comment #1 above regarding Site Class characterization and seismic <br />design values at the Site. <br /> <br />ENGEO Response to Comment 10 <br />Response to Comment 1 addresses this. <br /> <br />Comment 11 Geotechnical Report, Section 5.5 (Soil Corrosion Potential): <br />Same as Comment #7 above <br /> <br />ENGEO Response to Comment 11 <br />Please see Response to Comment 7. <br /> <br />Comment 12 Geotechnical Report, Section 6 (Earthwork Recommendations): <br />General Note: Throughout the Geotechnical Report, when referring to earthwork recommendations, <br />Section 4 is referred to. These references should be updated to refer to the correct subsections in <br />Section 6. <br /> <br />ENGEO Response to Comment 12 <br />We will add a clarifying section in the Reference 2 update. <br /> <br />Comment 13 Geotechnical Report, Section 6.1 (Expansive Soil Mitigation): <br />a. In the statement that indicates no expansive clay should be placed within the upper 3 feet of <br />building pads, the top of the building pad should be defined such as finished subgrade or bottom <br />of slab. <br />b. This section of the report should state what type of soil material should be used to replace <br />expansive (soil) material that is removed from the upper 3 feet of the building pads. BSK assumes <br />the replacement soil material would consist of a low expansion potential soil having a plasticity <br />index of less than 12 per Section 6.5 of the Geotechnical Report. <br /> <br />ENGEO Response to Comment 13 <br />a. We will define the term “building pad” in the Reference 2 update. <br />b. We will add a comment on recommended fill for building pads. Note, building pads will likely be <br />excavated into sandstone in most areas based on depths to bedrock encountered in explorations <br />in building pads shown in Figure 2 of Reference 2 and elevations shown in Sheets C3 and C4 of <br />“Improvement Plans for Hana Japan” by Alexander & Associates Inc., dated March 19, 2024. We <br />opine that the chance of encountering significant clay in the building pads is low. To be consistent <br />with non-expansive sandstone, we will recommend either processed excavated sandstone or low <br />plasticity import be used to backfill any pockets of clay to be removed from the building pads. <br />Exhibit 1 shows the location of the previous borings, along with the building location and existing <br />and planned grades. <br /> <br />