Laserfiche WebLink
Hana Japan Restaurant Project 6 <br />Mitigation Monitoring and Reporting Program May 2025 <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Hana Japan Restaurant Project <br />Impact <br />Number Impact Mitigation Measure <br />Monitoring <br />Agency <br />Implementation <br />Schedule <br />Sign <br />-off <br />immediately contacted for guidance. The <br />bumble bee shall be collected into a vial and <br />frozen, as well as photographed in accordance <br />with accepted methods. Record the date, <br />location, GPS coordinators, project name, <br />collector, and any other relevant information <br />related to the cause of death or injury (e.g., <br />chilling container may have been too cold; <br />extreme shifts in temperature during collection, <br />vehicle strike, etc.). If the bumble bee is <br />specimen shall be sent to CDFW for further <br />assessment. <br /> <br />Nesting Birds and Raptors <br /> <br />IV-3. A pre-construction survey for nesting birds shall <br />be conducted by a qualified biologist within <br />seven days of commencing construction <br />activities, including, but not limited to, grubbing, <br />grading, and tree removal, if such activities <br />occur between February 1st and September 1st. <br />The survey shall include an examination of all <br />trees, shrubs, and ground on-site and within a <br />100-foot buffer around the project site <br />boundaries where bird species could be <br />disturbed by vibrations and/or other <br />construction-related noise (zone of influence). <br />The zone of influence includes areas outside the <br />project site where birds could be disturbed by <br />earth-moving vibrations and/or other <br />construction-related noise. If site work does not <br />commence within seven days of the survey, <br />another survey shall be conducted to ensure <br />that impacts would not occur to nesting birds. <br />Survey results shall be submitted to the <br />Community Development Department. If active <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />City of <br />Pleasanton <br />Community <br />Development <br />Department <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Within seven days <br />prior to <br />commencing <br />construction <br />activities which <br />occur between <br />Februrary 1st and <br />September 1st. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />