My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hana Japan Restaurant Project 7 <br />Mitigation Monitoring and Reporting Program May 2025 <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Hana Japan Restaurant Project <br />Impact <br />Number Impact Mitigation Measure <br />Monitoring <br />Agency <br />Implementation <br />Schedule <br />Sign <br />-off <br />nests of migratory birds are not detected within <br />approximately 100 feet of the project site, further <br />mitigation is not required. <br /> <br /> If birds are identified nesting on or within the <br />zone of influence, a qualified ornithologist or <br />biologist with extensive experience working with <br />nesting birds near and on construction sites <br />shall establish a temporary protective non- <br />disturbance buffer around the nest(s). The non- <br />disturbance buffer shall be staked with orange <br />construction fencing and shall be of sufficient <br />size to protect the nesting site from construction- <br />related disturbance. Typically, adequate nesting <br />buffers are located 50 feet from the nest site or <br />nest tree dripline for common passerine birds <br />and up to 100 feet for special-status passerine <br />birds. Upon completion of nesting surveys, if <br />nesting birds are identified on or within the zone <br />of influence, the qualified ornithologist/biologist <br />that frequently works with nesting birds shall <br />prescribe adequate nesting buffers to protect the <br />nesting birds from harm while the project is <br />constructed. The nesting buffer shall be <br />monitored daily for the first week of construction <br />to ensure that nesting birds are not affected by <br />on-site construction activities and that the buffer <br />size does not need to be increased. Once the <br />qualified ornithologist/biologist determines, <br />through direct observations, that birds are not <br />agitated by project construction, monitoring can <br />be reduced to once a week. <br /> <br /> Construction or earth-moving activity shall not <br />occur within any established nest protection <br />buffer prior to September 1st unless the qualified <br />ornithologist/biologist determines that the young <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.