Laserfiche WebLink
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />30 <br />May 2025 <br />If any sign(s) of a bumble bee nest is observed, and if the nest cannot be <br />established to host a species that is not Crotch’s bumble bee, then construction <br />shall not commence until CDFW provides further guidance, which may include, <br />but not be limited to, an additional survey by a bumble bee expert, waiting until <br />the colony active season ends, or obtaining take authorization. <br /> <br />If at any time during preconstruction surveys a Crotch’s bumble bee is found, <br />a qualified biologist/monitor approved by CDFW for bumble bee monitoring <br />shall be on-site during all construction activities. During construction <br />monitoring, the biologist shall scan for bumble bees using floral resources. If <br />bumble bees are observed after construction commences, construction shall <br />be halted if bumble bees are in harm’s way. For example, if an undetected nest <br />is present in the construction area, bumble bees could become visible if the <br />nest is disturbed, leading to construction being immediately halted. <br /> <br />If construction is halted because bumble bees are in harm’s way, construction <br />shall only recommence after establishing that the bees present are not Crotch’s <br />bumble bees. If Crotch’s bumble bees (or bees that could be that species) are <br />identified on-site, construction shall not recommence until CDFW provides <br />further guidance, which could include an additional survey by a bumble bee <br />expert, waiting until the colony active season ends, requiring take <br />authorization, or other actions (such as buffers). <br /> <br />If a suspected Crotch’s bumble bee is killed or injured during the source of <br />survey efforts, or during project activities, all work shall be stopped and the <br />CDFW Representative shall be immediately contacted for guidance. The <br />bumble bee shall be collected into a vial and frozen, as well as photographed <br />in accordance with accepted methods. Record the date, location, GPS <br />coordinators, project name, collector, and any other relevant information <br />related to the cause of death or injury (e.g., chilling container may have been <br />too cold; extreme shifts in temperature during collection, vehicle strike, etc.). If <br />the bumble bee is determined to be a Crotch’s bumble bee, the specimen shall <br />be sent to CDFW for further assessment. <br /> <br />Nesting Birds and Raptors <br />IV-3. A pre-construction survey for nesting birds shall be conducted by a qualified <br />biologist within seven days of commencing construction activities, including, <br />but not limited to, grubbing, grading, and tree removal, if such activities occur <br />between February 1st and September 1st. The survey shall include an <br />examination of all trees, shrubs, and ground on-site and within a 100-foot buffer <br />around the project site boundaries where bird species could be disturbed by <br />vibrations and/or other construction-related noise (zone of influence). The zone <br />of influence includes areas outside the project site where birds could be <br />disturbed by earth-moving vibrations and/or other construction-related noise. If <br />site work does not commence within seven days of the survey, another survey <br />shall be conducted to ensure that impacts would not occur to nesting birds. <br />Survey results shall be submitted to the Community Development Department. <br />If active nests of migratory birds are not detected within approximately 100 feet <br />of the project site, further mitigation is not required. <br />