Laserfiche WebLink
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />31 <br />May 2025 <br />If birds are identified nesting on or within the zone of influence, a qualified <br />ornithologist or biologist with extensive experience working with nesting birds <br />near and on construction sites shall establish a temporary protective non- <br />disturbance buffer around the nest(s). The non-disturbance buffer shall be <br />staked with orange construction fencing and shall be of sufficient size to protect <br />the nesting site from construction-related disturbance. Typically, adequate <br />nesting buffers are located 50 feet from the nest site or nest tree dripline for <br />common passerine birds and up to 100 feet for special-status passerine birds. <br />Upon completion of nesting surveys, if nesting birds are identified on or within <br />the zone of influence, the qualified ornithologist/biologist that frequently works <br />with nesting birds shall prescribe adequate nesting buffers to protect the <br />nesting birds from harm while the project is constructed. The nesting buffer <br />shall be monitored daily for the first week of construction to ensure that nesting <br />birds are not affected by on-site construction activities and that the buffer size <br />does not need to be increased. Once the qualified ornithologist/biologist <br />determines, through direct observations, that birds are not agitated by project <br />construction, monitoring can be reduced to once a week. <br /> <br />Construction or earth-moving activity shall not occur within any established <br />nest protection buffer prior to September 1st unless the qualified <br />ornithologist/biologist determines that the young have fledged and have <br />attained sufficient flight skills to avoid project construction zones, or that the <br />nesting cycle is otherwise completed. The nest completion date can be <br />significantly earlier or later and shall ultimately be determined by the qualified <br />biologist. At the end of the nesting cycle and/or fledging from the nest, as <br />determined by a qualified biologist, temporary nesting buffers may be removed, <br />and grading and construction may commence in established nesting buffers <br />without further regard for the nest site. <br /> <br />IV-4. If nesting raptors or other migratory birds are detected on or adjacent to the <br />site during the survey, an appropriate non-disturbance buffer shall be <br />established around all active nests. Typically, adequate nesting buffers are 50 <br />feet from the nest site or nest tree dripline for common passerine birds and up <br />to 100 feet for special-status passerine birds. The actual size of buffer would <br />be determined by the project biologist, and would depend on species, <br />topography, and type of activity that would occur in the vicinity of the nest. The <br />project buffer shall be clearly staked with construction fencing and shall be <br />monitored periodically by the project biologist to ensure compliance. After the <br />nesting is completed, as determined by the biologist, the buffer would no longer <br />be required. Buffers shall remain in place for the duration of the breeding <br />season or until a qualified biologist has confirmed that all chicks have fledged <br />and are independent of their parents. <br /> <br />b,c. The project site is currently undeveloped, though is bisected by a concrete drainage ditch <br />and contains one on-site tree. According to the BRSA prepared for the proposed project, <br />the project site does not contain any wetlands or aquatic features. Therefore, the proposed <br />project would not have a substantial adverse effect on riparian habitat, sensitive natural <br />communities, or federally protected wetlands, and a less-than-significant impact would <br />occur. <br />