Laserfiche WebLink
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />47 <br />May 2025 <br />emissions are qualitative, operational GHG emissions have been estimated using <br />CalEEMod for disclosure purposes (see Appendix A). The emissions estimates prepared <br />for the proposed project determined that operation of the project would result in maximum <br />unmitigated annual GHG emissions of 428 MTCO2e/yr. <br /> <br />BAAQMD Thresholds of Significance <br />According to BAAQMD’s qualitative GHG thresholds of significance, a project must either <br />include specific project design elements (e.g., exclude use of natural gas, achieve a <br />specific reduction in project-generated VMT below the regional average) or be consistent <br />with a local GHG reduction strategy that meets the criteria under State CEQA Guidelines <br />Section 15183.5(b).23 <br /> <br />In February 2022, the City of Pleasanton adopted an updated Climate Action Plan (CAP) <br />2.0,24 which, according to Section 2.3 of the CAP, meets the criteria to be a GHG reduction <br />strategy under CEQA Guidelines Section 15183.5(b). The CAP 2.0 includes specific <br />strategies and actions to reduce emissions to 4.11 MTCO2e/yr per capita by 2030 (70 <br />percent below 1990 levels) and provide substantial progress towards carbon neutrality by <br />2045. Pursuant to Section 15183.5 of the CEQA Guidelines, a lead agency may determine <br />that a project’s incremental contribution to a cumulative effect is not cumulatively <br />considerable if the project complies with a previously adopted plan. The CAP 2.0 is <br />considered a “qualified” GHG reduction strategy and provides CEQA streamlining for <br />future development that are subject to discretionary review and trigger environmental <br />review pursuant to the CEQA. <br /> <br />Accordingly, a GHG Emission Compliance Checklist (Compliance Checklist)25 has been <br />prepared for the proposed project (see Appendix D) and is summarized below. Therefore, <br />the following analysis is based on the proposed project’s consistency with the City’s 2022 <br />CAP. <br /> <br />As discussed in the Compliance Checklist, the proposed project would be consistent with <br />CALGreen Code requirement 3 within the CAP by complying with all requirements of the <br />non-residential CALGreen checklist. The proposed project would also include energy- <br />efficient window upgrades, LED lighting, and other efficiency upgrades to satisfy S2 of the <br />CAP. In addition, consistent with CALGreen requirement 13 within the CAP, the proposed <br />project would install EV charging infrastructure, with 10 percent of parking being EV <br />charging stations. Furthermore, the proposed project would comply with Chapter 9.21 of <br />the City’s Municipal Code, which would ensure that the majority of concrete and debris <br />resulting from construction and demolition is diverted for recycling or reuse. Additionally, <br />the proposed project would provide adequate recycling, compost, and landfill containers <br />to meet SB 1383 requirements, Municipal Code Chapter 9.20, and CAP strategy MC-1. <br />The proposed project would be consistent with P15 of the CAP and Chapter 17.14 of the <br />City’s Municipal Code, as well as incorporate water efficient plumbing, and landscaping <br />consistent with the State’s MWELO. Finally, the proposed project would include and <br />incorporate on-site stormwater management and climate-adapted plantings to comply with <br />SF Bay Region Requirements and P13 of the CAP, respectively. <br /> <br />23 Bay Area Air Quality Management District. CEQA Thresholds for Evaluating the Significance of Climate Impacts <br />From Land Use Projects and Plans. April 2022. <br />24 City of Pleasanton. Climate Action Plan 2.0. Adopted February 2022. <br />25 City of Pleasanton Community Development Department, Planning Division. GHG Emission Compliance Checklist. <br />July 2022.