Laserfiche WebLink
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />52 <br />May 2025 <br />X. HYDROLOGY AND WATER <br />QUALITY. <br />Would the project: <br />Potentially <br />Significant <br />Impact <br />Less-Than- <br />Significant <br />with <br />Mitigation <br />Incorporated <br />Less-Than- <br />Significant <br />Impact <br />No <br />Impact <br />a. Violate any water quality standards or waste discharge <br />requirements or otherwise substantially degrade surface <br />or ground water quality? <br />    <br />b. Substantially decrease groundwater supplies or interfere <br />substantially with groundwater recharge such that the <br />project may impede sustainable groundwater <br />management of the basin? <br />    <br />c. Substantially alter the existing drainage pattern of the site <br />or area, including through the alteration of the course of <br />a stream or river or through the addition of impervious <br />surfaces, in a manner which would: <br /> <br />i. Result in substantial erosion or siltation on- or <br />off-site;     <br />ii. Substantially increase the rate or amount of <br />surface runoff in a manner which would result <br />in flooding on- or offsite; <br />    <br />iii. Create or contribute runoff water which would <br />exceed the capacity of existing or planned <br />stormwater drainage systems or provide <br />substantial additional sources of polluted <br />runoff; or <br />    <br />iv. Impede or redirect flood flows?     <br />d. In flood hazard, tsunami, or seiche zones, risk release of <br />pollutants due to project inundation?     <br />e. Conflict with or obstruct implementation of a water quality <br />control plan or sustainable groundwater management <br />plan? <br />    <br /> <br />Discussion <br />a, The following discussion provides a summary of the proposed project’s potential to violate <br />ci-ciii. water quality standards/waste discharge requirements, alter the drainage pattern of the <br />site resulting in erosion or siltation, increase the rate or amount of surface runoff in a <br />manner which would result in flooding on- or off-site, contribute runoff water which would <br />exceed the capacity of existing or planned stormwater drainage systems, or otherwise <br />degrade water quality during construction and operation. <br /> <br />Construction <br />During the early stages of construction activities, topsoil would be exposed during ground- <br />disturbance. Prior to overlaying the ground surface with impervious surfaces and <br />structures, the potential exists for wind and water erosion to discharge sediment and/or <br />urban pollutants into stormwater runoff, which could adversely affect water quality <br />downstream. <br /> <br />The SWRCB regulates stormwater discharges associated with construction activities <br />where clearing, grading, or excavation results in a land disturbance of one or more acres. <br />The City’s Municipal Regional Stormwater National Pollutant Discharge Elimination <br />System (NPDES) permit, Permit Number CAS612008, requires applicants to show proof <br />of coverage under the State’s General Construction Permit prior to receipt of any <br />construction permits. The State’s General Construction Permit requires a Storm Water <br />Pollution Prevention Plan (SWPPP) to be prepared for the site. A SWPPP describes Best