Laserfiche WebLink
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />53 <br />May 2025 <br />Management Practices (BMPs) to control or minimize pollutants from entering stormwater <br />and must address both grading and erosion impacts, as well as non-point source pollution <br />impacts of the project. Because the proposed project would disturb greater than one acre <br />of land, the proposed project would be subject to the requirements of the State’s General <br />Construction Permit. <br /> <br />In addition, the project would be required to comply with Chapter 9.14, Stormwater <br />Management and Discharge Control, of the City’s Municipal Code, which includes <br />standards for managing stormwater runoff. Pursuant to Section 9.14.130, construction <br />sites shall implement effective erosion control, run-on and runoff control, sediment control, <br />any appropriate active treatment systems, good site management, and non-stormwater <br />management through all phases of construction until the site is fully stabilized by <br />landscaping or the installation of permanent erosion control measures. Therefore, the <br />proposed project would not discharge sediment or urban pollutants through soil erosion, <br />violate any water quality standards or waste discharge requirements, or otherwise <br />substantially degrade surface or ground water quality during construction. <br /> <br />Operation <br />The proposed project would not involve operations typically associated with the generation <br />or discharge of polluted water. Following completion of project buildout, disturbed areas <br />of the site would be largely covered with impervious surfaces and topsoil would no longer <br />be exposed. However, the addition of impervious surfaces on the site would result in the <br />generation of urban runoff during project operations, which could contain pollutants if the <br />runoff comes into contact with vehicle fluids on parking surfaces and/or landscape <br />fertilizers and herbicides. All municipalities within Alameda County (and the County itself) <br />are required to develop more restrictive surface water control standards for new <br />development projects as part of the renewal of the Countywide NPDES permit. <br /> <br />As discussed throughout this IS/MND, on-site drainage is currently captured by a drainage <br />ditch bisecting the project site. Project construction would remove the on-site drainage <br />ditch, thereby changing the existing drainage pattern of the site. However, pursuant to <br />Section 9.14.140 of the City’s Municipal Code, the City of Pleasanton has adopted the <br />County C.3 Stormwater Standards, which require new development and redevelopment <br />projects that create or alter 10,000 or more sf of impervious area to contain and treat all <br />stormwater runoff from the project site. A total of approximately 40,601 sf of impervious <br />surfaces would exist on site following development of the proposed project, including <br />6,438 sf of rooftop surfaces. Thus, the project would be subject to the requirements of the <br />C.3 Stormwater Standards related to stormwater treatment, which are included in the <br />City’s Municipal Regional Stormwater NPDES Permit. In addition, the proposed project <br />would be subject to Sections 9.14.080 and 9.14.120 of the City’s Municipal Code, which <br />establish standards for stormwater discharge. Compliance with such requirements would <br />ensure that impacts to water quality standards or waste discharge requirements would not <br />occur during operation of the proposed project. <br /> <br />In order to manage and treat stormwater, the project site would be divided into 21 drainage <br />management areas (DMAs) (see Figure 6). Stormwater runoff within the project site would <br />flow primarily to IMP-1 and IMP-2 at the eastern and western ends of the site, as well as <br />the proposed landscaped areas and bio-retention areas located throughout the project <br />site, which would vary between six and 15 feet wide. Infiltration through the permeable <br />materials within the bio-retention areas would occur through the pervious landscaping <br />areas. The project site would also include installation of silva cells beneath the parking