My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hana Japan Restaurant Project <br />Initial Study/Mitigated Negative Declaration <br />53 <br />May 2025 <br />Management Practices (BMPs) to control or minimize pollutants from entering stormwater <br />and must address both grading and erosion impacts, as well as non-point source pollution <br />impacts of the project. Because the proposed project would disturb greater than one acre <br />of land, the proposed project would be subject to the requirements of the State’s General <br />Construction Permit. <br /> <br />In addition, the project would be required to comply with Chapter 9.14, Stormwater <br />Management and Discharge Control, of the City’s Municipal Code, which includes <br />standards for managing stormwater runoff. Pursuant to Section 9.14.130, construction <br />sites shall implement effective erosion control, run-on and runoff control, sediment control, <br />any appropriate active treatment systems, good site management, and non-stormwater <br />management through all phases of construction until the site is fully stabilized by <br />landscaping or the installation of permanent erosion control measures. Therefore, the <br />proposed project would not discharge sediment or urban pollutants through soil erosion, <br />violate any water quality standards or waste discharge requirements, or otherwise <br />substantially degrade surface or ground water quality during construction. <br /> <br />Operation <br />The proposed project would not involve operations typically associated with the generation <br />or discharge of polluted water. Following completion of project buildout, disturbed areas <br />of the site would be largely covered with impervious surfaces and topsoil would no longer <br />be exposed. However, the addition of impervious surfaces on the site would result in the <br />generation of urban runoff during project operations, which could contain pollutants if the <br />runoff comes into contact with vehicle fluids on parking surfaces and/or landscape <br />fertilizers and herbicides. All municipalities within Alameda County (and the County itself) <br />are required to develop more restrictive surface water control standards for new <br />development projects as part of the renewal of the Countywide NPDES permit. <br /> <br />As discussed throughout this IS/MND, on-site drainage is currently captured by a drainage <br />ditch bisecting the project site. Project construction would remove the on-site drainage <br />ditch, thereby changing the existing drainage pattern of the site. However, pursuant to <br />Section 9.14.140 of the City’s Municipal Code, the City of Pleasanton has adopted the <br />County C.3 Stormwater Standards, which require new development and redevelopment <br />projects that create or alter 10,000 or more sf of impervious area to contain and treat all <br />stormwater runoff from the project site. A total of approximately 40,601 sf of impervious <br />surfaces would exist on site following development of the proposed project, including <br />6,438 sf of rooftop surfaces. Thus, the project would be subject to the requirements of the <br />C.3 Stormwater Standards related to stormwater treatment, which are included in the <br />City’s Municipal Regional Stormwater NPDES Permit. In addition, the proposed project <br />would be subject to Sections 9.14.080 and 9.14.120 of the City’s Municipal Code, which <br />establish standards for stormwater discharge. Compliance with such requirements would <br />ensure that impacts to water quality standards or waste discharge requirements would not <br />occur during operation of the proposed project. <br /> <br />In order to manage and treat stormwater, the project site would be divided into 21 drainage <br />management areas (DMAs) (see Figure 6). Stormwater runoff within the project site would <br />flow primarily to IMP-1 and IMP-2 at the eastern and western ends of the site, as well as <br />the proposed landscaped areas and bio-retention areas located throughout the project <br />site, which would vary between six and 15 feet wide. Infiltration through the permeable <br />materials within the bio-retention areas would occur through the pervious landscaping <br />areas. The project site would also include installation of silva cells beneath the parking
The URL can be used to link to this page
Your browser does not support the video tag.